Skip to content
PlanIndex Get alerts
Menu

Planning application

25/09292/FULL

National Portrait Gallery 2 St Martin's Place London WC2H 0HE

Granted Westminster Full Planning Permission Application

Proposal

Installation of air source heat pumps and associated roof level alterations.

As published by the council, reference 25/09292/FULL

Timeline

Dates from the published record

  1. 23 Dec 2025

    Received by Westminster

  2. 14 Apr 2026

    Decision issued: Application Permitted

  3. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/09293/LBC Granted

    National Portrait Gallery 2 St Martin's Place London WC2H 0HE

    Installation of air source heat pumps and associated roof level alterations and internal pipework.

    23 Dec 2025 4m away Heritage and listed buildings
  • 26/03245/CLLB Awaiting decision

    National Portrait Gallery 2 St Martin's Place London WC2H 0HE

    Erection of temporary scaffold within loading bay to deliver the proposals permitted under 25/09292/FULL and 25/09293/LBC.

    15 May 2026 18m away
  • 25/09262/ADFULL Granted

    National Portrait Gallery 2 St Martin's Place London WC2H 0HE

    Details of photographic sample/s of new stonework for: (a) the new sections of plinth, and (b) indent repairs, which show the proposed type, colour and texture of the proposed stonework and demonstrate it matches the existing stone pursuant to Condition 4 of the planning permission dated 11 November 2025 (25/04255/FULL).

    22 Dec 2025 23m away Full applications
  • 25/09218/ADLBC Granted

    National Portrait Gallery 2 St Martin's Place London WC2H 0HE

    Details of photographic sample/s of new stonework for: (a) the new sections of plinth, and (b) indent repairs, which show the proposed type, colour and texture of the proposed stonework and demonstrate it matches the existing stone and a conservation method statement for ironwork repairs/repainting and adaptation including measures to remove it, transport it, secure it during off-site repair, the location/s for off-site repair and storage and contact details for responsible persons pursuant to Conditions 3 and 4 of the listed building consent dated 11 November 2025 (25/04256/LBC).

    19 Dec 2025 23m away Conditions
  • 26/01120/ADFULL Awaiting decision

    The National Gallery Trafalgar Square London WC2N 5DN

    Details of written scheme of investigation addendum for Phase 2, archaeological investigations pursuant to Condition 12 of planning permission dated 19th December 2022 (22/04894/FULL)

    23 Feb 2026 50m away Full applications
  • 26/02488/NMA Awaiting decision

    The National Gallery Trafalgar Square London WC2N 5DN

    Amendments to planning permission dated 19th December 2022 (RN:22/04894/FULL) for Remodelling of external gates, replacement glazing and adaption and enclosure of the loggia of the Sainsbury Wing. External alterations to the Wilkins Building, including alterations and part removal of railings, lawn and wall, with new entrance on Trafalgar Square to the Research Centre and Members Room. New basement link under Jubilee Walk, including excavation. Public realm works to the north of Trafalgar Square and Jubilee Walk, including new paving, benches, bollards and planting. New window and external alterations to Pigott Education Centre on Orange Street. Namely, relating to internal changes in the Wilkins building, access improvements, minor changes to layout, fire safety works; amends to means and doors and floors; most internal and some external including plant and lightwells; CCTV and refurbishment of windows.

    15 Apr 2026 50m away Amendments

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications