Skip to content
PlanIndex Get alerts
Menu

Planning application

43 William Mews London SW1X 9HQ

Granted Westminster 25/09117/FULL Full Planning Permission Application

Works: Extension Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of an infill extension at ground and first floor rear replacing the existing first floor enclosed balcony and the ground floor undercroft; installation of new rooflight on main roof.

As published by the council, reference 25/09117/FULL

Application record

Reference
25/09117/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
17 Dec 2025
Validated
23 Jan 2026
Decided
31 Mar 2026
Ward
Knightsbridge & Belgravia
Decision by
Delegated Decision
Postcode
SW1X 9HQ

Timeline

Dates from the published record

  1. 17 Dec 2025

    Received by Westminster

  2. 23 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 31 Mar 2026

    Decision issued: Application Permitted

  4. 20 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Maddox Planning Ltd Agent, a planning consultancy

113 applications on PlanIndex · across 19 councils · 89% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 31 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 45 William Mews London SW1X 9HQ

    25/08053/CLOPUD Submitted 5 Nov 2025 50 yards away

    86% historically approved · decision due ~31 Dec

    Replacement of existing single glazed windows and doors with double glazed timber windows and doors.

    Awaiting decision Lawful development Windows or glazing 7 docs
  • 14 Kinnerton Place South London SW1X 8EH

    26/04392/FULL Submitted 2 Jul 2026 50 yards away

    87% historically approved · decision due ~27 Aug

    Replacement shopfront and upgrade of existing air conditioning equipment and ventilation. (Linked with 26/04393/ADV)

    Awaiting decision Full applications Windows or glazing 9 docs
  • 14 Kinnerton Place South London SW1X 8EH

    26/04393/ADV Submitted 2 Jul 2026 50 yards away

    84% historically approved · decision due ~27 Aug

    Display of non-illuminated hanging sign measuring 0.50m x 0.30m.

    Decided Advertising
  • 17 William Mews London SW1X 9HF

    26/04409/FULL Submitted 3 Jul 2026 50 yards away

    87% historically approved · decision due ~1 Sep

    Variation of Condition 1 of planning permission dated 12 June 2025 (RN: 24/07507/FULL) for the erection of a roof extension and alterations to existing front elevation and fenestration; excavation of a new basement below part existing dwellinghouse; Namely, amendments to the ground floor windows.

    Decided Full applications Extension Windows or glazing 16 docs
    Domestic
  • 17 William Mews London SW1X 9HF

    26/02952/NMA Submitted 5 May 2026 50 yards away

    93% historically approved · decision due ~7 Jul

    Amendments to planning permission dated 12 June 2025 (RN: 24/07507/FULL) for the erection of a roof extension and alterations to existing front elevation and fenestration. Excavation of a new basement below part existing dwellinghouse.; NAMELY minor amendments to the ground floor front elevation including revisions to the approved window openings, together with associated minor internal reconfiguration works.

    Awaiting decision Amendments Extension Windows or glazing 12 docs
    Domestic
  • 17 William Mews London SW1X 9HF

    26/02286/ADFULL Submitted 7 Apr 2026 50 yards away

    87% historically approved · decision due ~2 Jun

    Details of all flood resilient and resistant measures (including finished floor levels) pursuant to condition 4 of planning permission dated 17th June 2025 (RN: 24/07507/FULL).

    Awaiting decision Full applications 5 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06317/FULL Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications