Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 4A Albert Hall Mansions Kensington Gore London SW7 2AN

Granted Westminster 25/08973/LBC Listed Building Consent Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of free standing condenser unit at main roof level and associated pipework within lightwell and internal alterations.

As published by the council, reference 25/08973/LBC

Application record

Reference
25/08973/LBC
Type
Listed Building Consent Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
10 Dec 2025
Validated
10 Dec 2025
Decided
20 Apr 2026
Ward
Knightsbridge & Belgravia
Decision by
Delegated Decision
Postcode
SW7 2AN

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/08972/FULL Granted

    Flat 4A Albert Hall Mansions Kensington Gore London SW7 2AN

    Installation of free standing condenser unit at main roof level and associated pipework within lightwell.

    Decided 20 Apr 2026 Full applications

Timeline

Dates from the published record

  1. 10 Dec 2025

    Received by Westminster

  2. 20 Apr 2026

    Decision issued: Application Permitted

  3. 20 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

E2 Architecture & Interiors Agent, an architecture practice

8 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 20 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Flat 4A Albert Hall Mansions Kensington Gore London SW7 2AN

    25/08972/FULL Submitted 10 Dec 2025 50 yards away

    Installation of free standing condenser unit at main roof level and associated pipework within lightwell.

    Granted Full applications 27 docs
  • Flat 3 Albert Hall Mansions Kensington Gore London SW7 2AN

    25/08769/LBC Submitted 2 Dec 2025 50 yards away

    Internal alterations and refurbishment.

    Granted Heritage and listed buildings 2 docs
  • Flat 3 Albert Hall Mansions Kensington Gore London SW7 2AN

    25/07605/LBC Submitted 21 Oct 2025 50 yards away

    Internal alterations to the first floor flat including provision internal fan coil units and associated service routes, replacement of chimney pieces/fireplaces, new in-built joinery, replacement of all internal doors and installation of new lighting.

    Granted Heritage and listed buildings 31 docs
  • Albert Hall Mansions Kensington Gore London SW7 2AN

    25/07533/FULL Submitted 17 Oct 2025 50 yards away

    External alterations to flats 7-8 including a mounted platform for AC units at main roof level. (Linked with 25/07534/LBC)

    Withdrawn Full applications New dwelling 22 docs
  • Albert Hall Mansions Kensington Gore London SW7 2AN

    25/07534/LBC Submitted 17 Oct 2025 50 yards away

    90% historically approved · decision due ~12 Dec

    External alterations to flats 7-8 including a mounted platform for AC units at main roof level, and internal works across the third and fourth floors.

    Awaiting decision Heritage and listed buildings New dwelling 19 docs
  • Flat 3 Albert Hall Mansions Kensington Gore London SW7 2AN

    25/07614/FULL Submitted 21 Oct 2025 50 yards away

    Installation of one condenser unit and associated pipework at roof level, boiler flue within the lightwell extending to the top of the lightwell from the first floor flat (Flat 3), new grilles and replacement of an existing window within the lightwell with a timber sash window.

    Granted Full applications Windows or glazing 22 docs

In Westminster

  • 26/07529/LBC Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new water supply works at the rear courtyard. (Linke with 26/07528/FULL)

    Received 5 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07509/LBC Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)

    Received 4 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07473/LBC Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)

    Received 3 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07471/LBC Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07461/LBC Awaiting decision

    1 Savile Row London W1S 3JR

    Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings