Planning application
25/08941/FULL
78 Duke Street London W1K 6JG
Proposal
Installation of wall-mounted lights, CCTV cameras, and WiFi access point.
As published by the council, reference 25/08941/FULL
Timeline
Dates from the published record
-
9 Dec 2025
Received by Westminster
-
9 Apr 2026
Decision issued: Application Permitted
-
20 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/08653/ADFULL Awaiting decision
78 Duke Street London W1K 6JG
Details of ventilation system pursuant to condition 24 of planning permission dated 7th August 2020 (RN: 19/07063/FULL).
-
25/08654/ADV Granted
78 Duke Street London W1K 6JG
Display of 1x non-illuminated logo sign and 1x internally menu board.
-
26/04821/FULL Awaiting decision
The Garden Cafe Brown Hart Gardens London W1K 8UH
Alterations to the existing lift and stair enclosure. (Linked with 26/04822/LBC and 26/04823/ADV)
-
26/04823/ADV Awaiting decision
The Garden Cafe Brown Hart Gardens London W1K 8UH
Display of non-illuminated menu case measuring 300 × 400mm; externally illuminated sign on lift/stair enclosure measuring 800 x 2200mm; three non-illuminated cast bronze plaque signs each measuring 500 × 600mm (Linked with 26/04822/LBC and 26/04821/FULL)
-
26/04822/LBC Awaiting decision
The Garden Cafe Brown Hart Gardens London W1K 8UH
Installation of signage and alterations to the existing lift and stair enclosure. (Linked with 26/04821/FULL and 26/04823/ADV)
-
25/04738/FULL Granted
Flat 3 81 Duke Street London W1K 5PE
Installation of two air conditioning condenser units at roof level and associated alterations.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.