Planning application
25/08394/ADFULL
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Proposal
Detailes of door and door furniture pursuant to Condition 6 (vii) of listed building consent dated 24 April 2025 (RN: 24/08537/LBC)
As published by the council, reference 25/08394/ADFULL
Timeline
Dates from the published record
-
17 Nov 2025
Received by Westminster
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/03404/LBC Awaiting decision
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Replacement of slate roof tiles on mansard roofs of Piccadilly, Green Park and Arlington Street elevations of the Ritz Hotel.
-
26/04502/ADLBC Awaiting decision
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Details of works to laylight of Palm Court; pursuant to condition 6 (xvii) of listed building consent dated 12th March 2026 (25/07529/LBC)
-
26/04299/ADLBC Awaiting decision
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Details of any changes to the approved works to the existing building fabric and repair strategies; pursuant to condition 13 of Listed Building Consent dated 12th March 2026 (RN 25/07529/LBC)
-
25/07529/LBC Awaiting decision
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Alterations and extensions to the Ritz Hotel and William Kent House including the change of use of the casino to a dual flexible use as hotel and/or private members club, a two storey side extension to William Kent House, extensions to the Ritz hotel including on the site of 22 Arlington Street comprising an extension of five basements, lower ground, ground, mezzanine and seven upper floors to provide additional hotel floorspace, new and upgraded hotel facilities including hotel rooms, restaurant and spa, new entrances on Arlington Street, arrival and drop off facilities, changes to the servicing and refuse facilities, car and cycle parking, plant, landscaping and all works including demolition, enabling, highways, temporary construction logistics works and other ancillary works (Amendments to listed building consent dated 24 April 2025 RN: 24/08537/LBC). (Linked with 25/07555/NMA)
-
25/07555/NMA Awaiting decision
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Amendments to planning permission dated 12 July 2022 (RN: 21/07264/FULL) for alterations and extensions to the Ritz Hotel and William Kent House including the change of use of the casino to a dual flexible use as hotel and/or private members club, a two storey side extension to William Kent House, extensions to the Ritz hotel including on the site of 22 Arlington Street comprising an extension of five basements, lower ground, ground, mezzanine and seven upper floors to provide additional hotel floorspace, new and upgraded hotel facilities including hotel rooms, restaurant and spa, new entrances on Arlington Street, arrival and drop off facilities, changes to the servicing and refuse facilities, car and cycle parking, plant, landscaping and all works including demolition, enabling, highways, temporary construction logistics works and other ancillary works. Namely, alterations including additional demolition as a result of detailed investigation work. (Linked with 25/07529/LBC)
-
26/04906/ADLBC Awaiting decision
The Ritz Hotel 150 - 156 Piccadilly London W1J 9BR
Sample panel of the proposed roofing slate pursuant to Condition 3 of listed building consent dated 20th July 2026 (RN: 26/03404/LBC)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.