Skip to content
PlanIndex Get alerts
Menu

Planning application

87 Charlwood Street London SW1V 4PB

Granted Westminster 25/08358/FULL Full Planning Permission Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of front paving slabs and risers.

As published by the council, reference 25/08358/FULL

Application record

Reference
25/08358/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Application Permitted
Received
14 Nov 2025
Validated
2 Mar 2026
Decided
2 Apr 2026
Ward
Pimlico North
Decision by
Delegated Decision
Postcode
SW1V 4PB

Timeline

Dates from the published record

  1. 14 Nov 2025

    Received by Westminster

  2. 2 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 2 Apr 2026

    Decision issued: Application Permitted

  4. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

2 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 87 Charlwood Street London SW1V 4PB

    26/01300/ADV Submitted 2 Mar 2026 6m away

    85% historically approved · decision due ~27 Apr

    Display of backpanel and lettering on stand-off locators on fascia sign measuring 4980mm x 690mm.

    Awaiting decision Advertising 11 docs
  • Basement Flat 85 Charlwood Street London SW1V 4PB

    22/02223/FULL Submitted 1 Apr 2022 8m away

    Extension of the lower ground floor flat into the existing basement vaults. Alterations to existing windows, doors and lightwell staircase and alterations to existing pavement railings and gate on the Alderney Street elevation.

    Granted Full applications Extension Windows or glazing 28 docs
  • 116 Alderney Street London SW1V 4HA

    26/05800/FULL Submitted 25 Aug 2026 38m away

    87% historically approved · decision due ~2 Nov

    Erection of a two storey rear extensions at lower ground and ground floor levels.

    Awaiting decision Full applications Extension
  • 74 Lupus Street London SW1V 3EL

    25/08768/FULL Submitted 2 Dec 2025 47m away

    Use of lower ground and ground floor as one residential unit (Class C3), reinstatement of lightwells and railings, installation of replacement shopfront, fenestration, new external metal stair, and associated alterations.

    Granted Full applications Windows or glazing 62 docs
  • 116 Alderney Street London SW1V 4HA

    26/03282/TCA Submitted 19 May 2026 55m away

    100% historically approved · decision due ~14 Jul

    We wish to remove a magnolia tree, which we planted several years ago as a scrub/small tree. It is too large and blocking light into the garden, and we are planning to do work to the garden in the future..

    Awaiting decision Trees 6 docs
  • Russell House Cambridge Street London SW1V 4EQ

    25/07670/FULL Submitted 23 Oct 2025 57m away

    87% historically approved · decision due ~22 Dec

    Installation of replacement existing windows to all elevations with timber double glazed windows; replacment of all front doors and frames to all flats with matching timber painted in colour to suit; Balcony doors to be in metal crittal style to match existing; Removal of all roof coverings and upstands; Replacement roofing felt and tapered insulation; and other associated works.

    Awaiting decision Full applications New dwelling Windows or glazing 34 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications