Planning application
25/08223/FULL
47 Chester Square London SW1W 9EA
Proposal
Variation of Condition 1 of planning permssion dated 10th September 2025 (RN:24/05375/FULL) for the Demolition of No 47 Ebury Mews and the erection of a two-storey replacement mews building with new basement level. Alterations and refurbishment to No. 47 Chester Square including demolition of modern rear additions, reinstatement of lower ground floor lightwell to the rear and extension of existing lower ground floor. Construction of ground floor link from 47 Chester Square to 47 Ebury Mews, consolidation of amenity courtyard at ground floor level, other internal and external works of refurbishment to 47 Chester Square namely, to allow rebuilding of the rear of the top floor mansard roof to the main house with new dormer windows and new monopitch rooflight to the stairwell below; awning removed to the closet wing; downpipes re-routed to rear elevation of main house; revisions to detailed design of glazed link; front door to Ebury Mews entrance enlarged and addition of flues above roof to the mews house. (Linked with 25/08226/LBC)
As published by the council, reference 25/08223/FULL
Timeline
Dates from the published record
-
11 Nov 2025
Received by Westminster
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/08226/LBC Awaiting decision
47 Chester Square London SW1W 9EA
Internal alterations. (Linked with 25/08223/FULL)
-
25/08383/ADFULL Awaiting decision
47 Chester Square London SW1W 9EA
Details of Site Waste Management Plan, pursuant to condition 5 of planning permission dated 10 September 2025 (RN 24/05375/FULL)
-
26/04643/ADLBC Awaiting decision
47 Chester Square London SW1W 9EA
Detailed drawing of the front entrance to be simplified to reflect a more traditional modest mews style and the existing entrance; Pursuant to condition 8 of Listed Building Consent dated 11 June 2026 (25/08226/LBC)
-
26/04763/NMA Awaiting decision
47 Chester Square London SW1W 9EA
Amendments to planning permission dated 11 June 2026 (25/08223/FULL) for: demolition of No 47 Ebury Mews and the erection of a two-storey replacement mews building with new basement level. Alterations and refurbishment to No. 47 Chester Square including demolition of modern rear additions, reinstatement of lower ground floor lightwell to the rear and extension of existing lower ground floor. Construction of ground floor link from 47 Chester Square to 47 Ebury Mews, consolidation of amenity courtyard at ground floor level, other internal and external works of refurbishment to 47 Chester Square namely, to allow alterations to link structure between the main house and mews design, and the rear roof profile to the main house. (Linked with 26/04756/LBC)
-
26/04756/LBC Awaiting decision
47 Chester Square London SW1W 9EA
Rebuilding of the rear of the top floor mansard roof to the main house, with dormer windows, and new monopitch rooflight to the stairwell below; removal of awning to the closet wing and parapet raised by four brick courses to match existing height, with Portland Stone coping added; re-route downpipes to rear elevation of main house; amended detailed design of glazed link; enlarge front door to Ebury Mews entrance; addition of flues above roof to the mews house; strengthening to existing floor joists where required within main house; improvements to building services. (Linked with 26/04763/NMA)
-
25/05498/FULL Withdrawn
46 Chester Square London SW1W 9EA
Erection of rear first floor orangery extension. (Linked RN: 25/05499/LBC)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.