Skip to content
PlanIndex Get alerts
Menu

Planning application

25/08137/FULL

12 Macclesfield Street London W1D 5BP

Awaiting decision Westminster Full Planning Permission Application

Proposal

Dual / alternative use of the second and third floors for either residential (Class C3) use or restaurant (Class E) use

As published by the council, reference 25/08137/FULL

Timeline

Dates from the published record

  1. 7 Nov 2025

    Received by Westminster

  2. 20 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/04365/ADFULL Awaiting decision

    12 Macclesfield Street London W1D 5BP

    Details of sound insulation measures and a noise assessment report pursuant to condition 9 of planning permission dated 12 March 2026(RN: 25/08669/FULL).

    1 Jul 2026 1m away Full applications
  • 26/01582/ADV Awaiting decision

    12 Macclesfield Street London W1D 5BP

    Display of awning with logo and text on awning and valance.

    11 Mar 2026 1m away Advertising
  • 26/03649/ADFULL Awaiting decision

    12 Macclesfield Street London W1D 5BP

    Details of how waste is to be stored on site; pursuant to condition 4 of planning permission dated 17th March 2026 (RN 25/08137/FULL)

    4 Jun 2026 1m away Full applications
  • 26/03652/ADFULL Awaiting decision

    12 Macclesfield Street London W1D 5BP

    Details of secure cycle storage for the residential use; pursuant to condition 5 of planning permission dated 17th March 2026 (RN 25/08137/FULL)

    4 Jun 2026 1m away Full applications
  • 25/06634/FULL Granted

    12 Macclesfield Street London W1D 5BP

    Alterations to the existing kitchen extract at the rear of the property and installation of an air-conditioning condenser unit on the rear first floor elevation; installation of an air intake grille within the fascia of the shopfront on the front elevation.

    16 Sep 2025 2m away Full applications
  • 25/07005/FULL Awaiting decision

    90 - 92 Shaftesbury Avenue London W1D 5EA

    Alterations to shopfront including replacement glazing; installation of new entrance door; the addition of aluminium louvres, integration of LED strip channels. (Linked with 25/07006/ADV)

    30 Sep 2025 18m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications