Planning application
36 Hertford Street London W1J 7SE
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of Operational Management Plan pursuant to condition 43 of planning permission dated 30th October 2025 (RN:24/05472/FULL).
As published by the council, reference 25/08081/ADFULL
Application record
- Reference
- 25/08081/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Pending
- Received
- 6 Nov 2025
- Validated
- 6 Nov 2025
- Ward
- West End
- Postcode
- W1J 7SE
Site history
Applications at this address on the Westminster register
This site has had 6 applications since 2025: 3 approved, 0 refused.
-
26/03235/ADFULL Awaiting decision
36 Hertford Street London W1J 7SE
Details of evidence of Secure by Design Accreditation pursuant to condition 7 of planning permission dated 31st October 2025 (RN:24/05472/FULL)
-
26/02443/ADFULL Awaiting decision
36 Hertford Street London W1J 7SE
Details of supplementary report, pursuant to condition 9 of planning permission dated 31 October 2025 (RN 24/05472/FULL)
-
26/00730/ADLBC Granted
36 Hertford Street London W1J 7SE
Details of samples of the facing materials including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition (part) 3 of listed building consent dated 30 October 2025 (RN: 24/02604/LBC)
-
26/00729/ADLBC Granted
36 Hertford Street London W1J 7SE
Details of sample (photos and spec) of new finish to the stair landings pursuant to condition 8 of listed building consent dated 30 October 2025 (RN: 24/02604/LBC).
-
25/08894/ADLBC Granted
36 Hertford Street London W1J 7SE
Details of window linings pursuant to conditon 4 (b) of listed building consent dated 30 October 2025 (RN: 24/02604/LBC)
Timeline
Dates from the published record
-
6 Nov 2025
Received by Westminster
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 65 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,250 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 89 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
36 Hertford Street London W1J 7SE
87% historically approved · decision due ~9 Jun
Details of supplementary report, pursuant to condition 9 of planning permission dated 31 October 2025 (RN 24/05472/FULL)
Awaiting decision Full applications 16 docs -
36 Hertford Street London W1J 7SE
87% historically approved · decision due ~14 Jul
Details of evidence of Secure by Design Accreditation pursuant to condition 7 of planning permission dated 31st October 2025 (RN:24/05472/FULL)
Awaiting decision Full applications 7 docs -
36 Hertford Street London W1J 7SE
Details of samples of the facing materials including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition (part) 3 of listed building consent dated 30 October 2025 (RN: 24/02604/LBC)
Granted Conditions Windows or glazing 7 docs -
36 Hertford Street London W1J 7SE
Details of sample (photos and spec) of new finish to the stair landings pursuant to condition 8 of listed building consent dated 30 October 2025 (RN: 24/02604/LBC).
Granted Conditions 11 docs -
36 Hertford Street London W1J 7SE
Details of window linings pursuant to conditon 4 (b) of listed building consent dated 30 October 2025 (RN: 24/02604/LBC)
Granted Conditions Windows or glazing 38 docs -
Development Site At 2-6 Stanhope Row, 16 Stanhope Row, 36-37 Hertford St And 16A, 16B And 17 Market Mews London
Amendments to planning permission dated 31st October 2025 (RN:24/05472/FULL) for Variation of condition 1 and removal of condition 35 of planning permission dated 24th May 2023 (RN 22/05759/FULL) for the demolition and replacement of existing fifth floor, demolition of existing plant room, and erection of a single storey roof extension at sixth floor to 2-6 Stanhope Row with replacement windows, terraces at fifth and sixth floors and remodelling works; demolition of 16 Stanhope Row, 16a, 16b and 17 Market Mews, excavation at basement level and erection of a four-storey (plus part basement floor) replacement building, all to provide an 82-bedroom hotel (Class C1). Demolition of 37 Hertford Street and erection of replacement building (basement to fourth floor mansard roof plus rooftop plant enclosure); and Internal and external alterations to 36 Hertford Street including demolition and remodelling of existing mansard roof; together with excavation at basement level to 36 and 37 Hertford Street to lower existing basement slab level; all to provide 16 residential dwellings (Class C3) along with provision for cycle parking, terraces, refuse storage and rooftop plant, together with other associated works. NAMELY; to enable the introduction of low level external lighting,
Granted Amendments Extension Loft or dormer +2 13 docsSmall domestic
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising repolacement window and installation of double opening door.
-
26/06234/FULL Awaiting decision
40 Grosvenor Place London SW1X 7HJ
Use of lower ground floor of Unit 3 and ground floor of Unit 2 as gym (Class E(d)) and/ or office (Class E(g))
-
26/06249/FULL Awaiting decision
53 Wimpole Street London W1G 8YH
Removal and Installation of external rear air condensers and associated pipe work to ground floor, including internal works to ground and first floor. (Linked with 26/06250/LBC)
-
26/03576/FULL Decided
15A Devonshire Terrace London W2 3DW
Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)