Planning application
25/08059/FULL
69 - 71 Baker Street London W1U 6RB
Proposal
Installation of replacement window with new single-leaf fire exit door to rear external wall at ground floor level of 69 Baker Street.
As published by the council, reference 25/08059/FULL
Timeline
Dates from the published record
-
5 Nov 2025
Received by Westminster
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/03205/FULL Awaiting decision
69 - 71 Baker Street London W1U 6RB
Proposed new lightwell platform lift and associated new single leaf door into lightwell at lower ground level, with associated proposed replacement of section of stone wall with metal gate.
-
26/02401/FULL Awaiting decision
69 - 71 Baker Street London W1U 6RB
Installation of new entrance door and fan light replacing existing window at rear ground floor of No. 69.
-
26/01390/FULL Awaiting decision
3 - 6 Kenrick Place London W1U 6HD
Erection of new rear dormer, refurbishment of the existing windows (excluding the ground floor shopfront glazing to No. 6 Kenrick Place) with new painted timber framed double glazed units, replacement of glazed roof lantern with a new metal framed roof lantern, installation of four new condenser units at roof level, installation of timber doors and Juliet balcony railing to front elevation, installation of two rooflights to the west facing pitched roof, installation of frosted manifestation film to a small number of west elevation window panes and installation of access door, safety balustrading and safety access walkway at roof level.
-
25/09006/ADV Awaiting decision
55 Baker Street London W1U 8EW
Display of internally illuminated other sign measuring 0.95m X 1.67m (Linked to 25/09005/FULL)
-
26/04487/CLEUD Awaiting decision
49A Chiltern Street London W1U 6LZ
Confirmation of lawful use of 49A Chiltern Street as apart-hotel (Class C1).
-
25/06011/ADV Granted
37 Chiltern Street London W1U 7PW
Display of graphic window vinyls on the ground floor windows at 37 Chiltern Street for a temporary period from 01 September 2025 until 31 August 2026.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.