Planning application
25/08049/FULL
2 Cavendish Square London W1G 0PA
Proposal
Removal of existing plant equipment, Installation of new air source heat pump, two new air conditioning units and relocation of four existing air conditioning units within existing plant enclosure at roof level. Associated alterations to lift atrium roof.
As published by the council, reference 25/08049/FULL
Timeline
Dates from the published record
-
5 Nov 2025
Received by Westminster
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00992/AD7 Granted
2 Cavendish Square London W1G 0PA
Display for a temporary period of six months of a non-illuminated estate agent board attached to the railings in front of the building at street level and measuring 0.6 x 0.45m.
-
25/05570/ADLBC Granted
1 Cavendish Square London W1G 0LA
Details of new windows and roof lights pursuant to Condition 5(B) PART of Listed Building Consent dated 03 September 2024 (RN23/08101/LBC)
-
26/04900/LBC Awaiting decision
Flanders House 1A Cavendish Square London W1G 0PH
Maintenance and repair works to the external elevations of the building.
-
25/08061/LBC Awaiting decision
3 Cavendish Square London W1G 0LB
Internal fitout works to return a CAT B space back to a CAT A space as part of the landlord's dilapidation works.
-
25/05783/LBC Granted
Third Floor 3 Cavendish Square London W1G 0LB
Fit out works to the third floor
-
25/07814/LBC Awaiting decision
1 Cavendish Square London W1G 0LA
Installation of fibre optic cables along the lightwell street wall in existing tray work into basement comms room.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.