Planning application
25/08026/ADFULL
Development Site At 14 To 17 Paddington Green London
Proposal
Details of ventilation and other services termination at façade or roof for blocks G and H only as approved by the City Council as Local Planning Authority on 21 June 2024 under application reference 24/01491/ADFULL or in accordance with alternative details as submitted to and approved by the Local Planning Authority. For the avoidance of doubt; Condition 24 Part E was previously discharged under application reference 24/01491/ADFULL in June 2024. The only change to these approved details is the installation of the flue serving the life safety generator, which has been highlighted (bubbled) on the accompanying plans. All other ventilation and other services terminating at the fa?ade or roof remaining as per the details previously discharged under 24/01491/ADFULL pursuant to condition 24 (E) of planning permission dated 30th April 2025 (RN:24/03408).
As published by the council, reference 25/08026/ADFULL
Timeline
Dates from the published record
-
5 Nov 2025
Received by Westminster
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/04637/ADFULL Granted
Development Site At 14 To 17 Paddington Green London
Details of secure cycle parking within the basement levels pursuant to Condition 42 of planning permission dated 30 April 2025 (RN 24/03408/FULL)
-
25/06946/ADFULL Granted
Development Site At 14 To 17 Paddington Green London
Details of obscure glazing pursuant to condition 57 of planning permission dated 30th April 2025 (RN:24/03408/FULL).
-
25/05546/ADFULL Awaiting decision
Development Site At 14 To 17 Paddington Green London
Detailed drawings and a bio-diversity management plan in relation to the ground floor restaurant extensions green roof pursuant to condition 54 of planning permission dated 30th April 2025 (RN:24/03408/FULL)
-
25/08027/ADFULL Awaiting decision
Development Site At 14 To 17 Paddington Green London
Detailed drawings of Fencing/railings or other means of enclosure surrounding buildings (and including any means of enclosure to both east and west sides of central courtyard area); External integral lighting to buildings and courtyard; and hard and soft landscaping scheme pursuant to part conditions 24C, 24G, 27 of planning permission dated 30 January 2023 April 2025 (RN 24/03408/FULL)
-
25/05547/ADFULL Granted
Development Site At 14 To 17 Paddington Green London
Details of the fire escape stairs within the lower ground floor lightwells pursuant to condition 51 of planning permission dated 30th April 2025 (RN:24/03408/FULL)
-
25/06315/FULL Awaiting decision
Development Site At 14 To 17 Paddington Green London
Variation of conditions 5, 6, 7, 11, 13, 14, 15, 16, 17, 18, 24, 26, 33, 35, 38 of planning permission dated 30th April 2025 (RN 24/03408/FULL) for the Variation of conditions 1 and 52 of planning permission dated 05 January 2023 (RN: 22/03790/FULL) for variation of condition 1 of planning permission dated 29 March 2019 (RN: 18/08004/FULL), which itself Varied condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide residential units, with associated landscaping, basement car and cycle parking and servicing provision. Namely, to allow addition of one floor of residential accommodation to Block G and to parts of Block H to add residential units and to reduce carbon offset payment to allow connection to Church Street District Heating Scheme. Namely, to re-plan block G and H to allow senior living accommodation in block G; associated external alterations including a single storey loggia and extension within the courtyard; associated residential amenities to ground floor and part basements of block G and part H; reduction in units from 216 - 203; introduction of PV panels on the roof of Block G; revised landscaping; NAMELY, to introduce phasing and severability to the permission to facilitate separate delivery of 17 Paddington Green, with associated planning condition wording changes and a revision to the proposed energy strategy and cycle parking.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.