Planning application
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Amendments to planning permission dated 16 July 2025 (RN: 24/02136/FULL), namely i) changes to the description of development; ii) moving the list of approved drawing numbers into Condition 1 and iii) to add a new condition (Condition 72) to the permission to reference the storey height range of buildings within the development.
As published by the council, reference 25/08019/NMA
Application record
- Reference
- 25/08019/NMA
- Type
- Non-material amendments
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 4 Nov 2025
- Validated
- 4 Nov 2025
- Decided
- 17 Feb 2026
- Ward
- Knightsbridge & Belgravia
- Decision by
- Delegated Decision
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2025: 1 approved, 0 refused.
-
26/03746/NMA Awaiting decision
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 16 July 2025 (RN: 24/02136/FULL) which varied conditions 1, 8 and 22 and removal of condition 61 of permission dated 18 October 2022 (RN 20/03307/FULL) (as amended by 22/08076/NMA, 22/08305/NMA, 23/00830/NMA, 23/01541/NMA, 23/08324/NMA and 23/08634/NMA for 'Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant, and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. NAMELY, amend wording of condition 6 to allow the addition of Phase 1B plan to enable the construction of Building A up to and including ground floor level.
-
26/02514/CLEUD Awaiting decision
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Following demolition of buildings on site, confirmation from Westminster City Council that material operations have been lawfully carried out and that, as a result, the planning permission (RN 20/03307/FULL) dated 18 October 2022, in respect of the Site has been implemented.
Timeline
Dates from the published record
-
4 Nov 2025
Received by Westminster
-
17 Feb 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Newmark LLP Agent
930 applications on PlanIndex · across 40 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 17 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Flat 5 Walden House Pimlico Road London SW1W 8LH
Installation of satellite dish on chimney breast at roof level.
Granted Full applications 5 docs -
Walden House Pimlico Road London SW1W 8LH
Replacement of existing windows with powder coated double glazed tilt and turn windows on the front and rear elevations.
Withdrawn Full applications Windows or glazing 10 docs -
Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
93% historically approved · decision due ~3 Aug
Amendments to planning permission dated 16 July 2025 (RN: 24/02136/FULL) which varied conditions 1, 8 and 22 and removal of condition 61 of permission dated 18 October 2022 (RN 20/03307/FULL) (as amended by 22/08076/NMA, 22/08305/NMA, 23/00830/NMA, 23/01541/NMA, 23/08324/NMA and 23/08634/NMA for 'Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant, and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works. NAMELY, amend wording of condition 6 to allow the addition of Phase 1B plan to enable the construction of Building A up to and including ground floor level.
Awaiting decision Amendments New dwelling Demolition +1 11 docs -
Ebury Square Gardens Ebury Square London
London Plane, Platanus x hispanica Fell to ground level within 4 weeks.
Decided Trees 1 doc -
Orange Square Farmers Market Pimlico Road London SW1W 8NB
Use of open space as weekly Saturday farmers' market.
Granted Full applications 7 docs -
17B Pimlico Road London SW1W 8NA
88% historically approved · decision due ~17 Jun
Detailed drawings, including sections (scale 1:20 and 1:5) of the new doors pursuant to condition 3 of planning permission dated 10th July 2024 (RN:24/03208/FULL)
Awaiting decision Full applications 3 docs
Other amendment applications
In Westminster
-
26/07181/NMA Awaiting decision
Newlands House 37 - 40 Berners Street London W1T 3NA
Amendments to planning permission dated 9th October 2025 (RN:25/04048/FULL) forInfilling of the ground floor undercroft along Mortimer Street (Class E), replacement of ground floor frontage to the whole building and refurbishment of the upper floor facades. Namely, alterations to the approved green roof area at the site.
-
26/07132/NMA Awaiting decision
157 - 159 Victoria Street London SW1E 5NA
Amendments to planning permission dated 27 August 2026 (RN: 26/04666/FULL) for the: Installation of combined defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch. NAMELY, to allow alteration to design of combined defibrillator and bleed kit cabinet.
-
26/07086/NMA Awaiting decision
Windsor House 50 Victoria Street London SW1H 0TL
Amendments to planning permission dated 18th September 2026 (RN 26/01445/FULL) for the Refurbishment of Windsor House and Christchurch House (excluding residential part), including re-cladding and amendment of facades, replacement of windows, new end-of-trip facilities, installation of roof-level plant and screening, and associated works, to provide office, retail, restaurant and indoor recreation accommodation (Class E) with amenity spaces, including a new roof level pavilion to Christchurch House and link bridge between Windsor House and Christchurch House. NAMELY, amendments to the wording of Conditions 1, 11, 12, 13,14, 15 and 26.
-
26/07071/NMA Awaiting decision
London School Of Economics & Political Science Houghton Street London WC2A 2AE
Amendments to planning permission dated 21st Februrary 2018 (RN:17/05855/FULL) for Variation of Condition 1 of planning permission dated 19 October 2016 (RN:16/05155/FULL) for demolition of existing buildings known as Clare Market, The Anchorage, the East Building, St Clements (partial) and Tower One (partial) and redevelopment to provide replacement interconnected academic facilities for Class D1 and ancillary uses, comprising a two storey basement, a part six storey / part 13 storey building and a seven storey core extension to the St Clements building and associated cycle parking and other works; all arranged around a new public square namely, removal of two cycle stands.
-
26/06211/NMA Decided
15 Portland Place London W1B 1PT
Amendments to planning permission dated 21 July 2022 (RN:22/03521/FULL) which varied Condition 5 of planning permission dated 11 April 2018 (17/10815/FULL) for: Use of the building for a temporary period of 20 years as a medical use (Use Class D1) personal to OM Tower LLP namely to amend the wording of Condition 3 to omit the words " No one else may benefit from this permission" to allow the use by third party practitioners.