Planning application

25/07911/ADFULL

Grosvenor Gardens House 35 - 37 Grosvenor Gardens London SW1W 0BS

Awaiting decision Westminster Approval of Details (Full PP)

Proposal

Detailed drawings of the design, location and materials of all new external flues, vents and drainage pipework to include the new ventilation panels to the rear of the central roof pavilion pursuant to condition 9 of planning permission dated 9th February 2023

As published by the council, reference 25/07911/ADFULL

Timeline

Dates from the published record

  1. 31 Oct 2025

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/07892/ADLBC Awaiting decision

    Grosvenor Gardens House 35 - 37 Grosvenor Gardens London SW1W 0BS

    Details showing the design, location and materials of all new external flues, vents, drainage pipework and new ventilation panels to the rear of the central roof pavilion pursuant to condition 7 of listed building dated 9th February 2023 (RN:21/07165/LBC)

    30 Oct 2025 0m away Conditions
  • 25/07910/ADFULL Awaiting decision

    Grosvenor Gardens House 35 - 37 Grosvenor Gardens London SW1W 0BS

    Detailed drawings of the Western lift over run pursuant to condition 6 (3) of planning permission dated 9th February 2023 (RN:21/06372/FULL)

    31 Oct 2025 0m away Full applications
  • 25/07913/ADLBC Awaiting decision

    Grosvenor Gardens House 35 - 37 Grosvenor Gardens London SW1W 0BS

    Details of windows and dormers pursuant to condition 4 (ii) of listed building consent dated 09 February 2023 (21/07165/LBC). (Linked with 25/07909/ADFULL)

    31 Oct 2025 0m away Conditions
  • 25/07909/ADFULL Awaiting decision

    Grosvenor Gardens House 35 - 37 Grosvenor Gardens London SW1W 0BS

    Details of windows and dormers pursuant to condition 5 (ii) of planning permission dated 09 February 2023 (RN: 21/06372/FULL). (Linked with 25/07913/ADLBC)

    31 Oct 2025 0m away Full applications
  • 25/07890/ADLBC Awaiting decision

    Grosvenor Gardens House 35 - 37 Grosvenor Gardens London SW1W 0BS

    Details of windows and dormers and detailed inventory (including photographs) of all the surviving historic fittings and a method statement giving full details of the dismantling, storage and re-assembly of the fittings) pursuant to condition 4 (2) and 12 (ii) of listed building dated 9th February 2023 (RN:21/07165/LBC)

    30 Oct 2025 0m away Conditions
  • 25/07891/ADLBC Awaiting decision

    Grosvenor Gardens House 35 - 37 Grosvenor Gardens London SW1W 0BS

    Detailed drawings of the Western lift over run pursuant to condition 5 (3) of listed building dated 9th February 2023 (RN:21/07165/LBC)

    30 Oct 2025 0m away Conditions

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications