Skip to content
PlanIndex Get alerts
Menu

Planning application

25/07877/FULL

3A Melina Place London NW8 9SA

Awaiting decision Westminster Full Planning Permission Application

Proposal

Excavation of a basement with lightwells; alterations to flat roof; green roof; installation of rooflights; construction of an extension at first floor level, changes to and insertion of windows, doors and rooflights; alterations to elevations; landscaping and associated works to garden.

As published by the council, reference 25/07877/FULL

Timeline

Dates from the published record

  1. 30 Oct 2025

    Received by Westminster

  2. 13 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00953/TPO Awaiting decision

    12 Melina Place London NW8 9SA

    T1 - Pyrus "Conference", height c. 10 metres, mature. Proposed work: deadwood, crown reduce by 20% and lightly shape T2 - Horse Chestnut, height c. 18 metres, mature. Proposed work: crown thin by 25% Reasons: standard maintenance every five or six years

    12 Feb 2026 15m away Trees
  • 26/00868/TCA Awaiting decision

    12 Melina Place London NW8 9SA

    T3 - Silver Birch, height c 12 metres, mature. Proposed work: lift by two metres and crown thin by 10% Reasons: standard maintenance every five or six years

    12 Feb 2026 15m away Trees
  • 26/00558/ADFULL Awaiting decision

    2 Melina Place London NW8 9SA

    Details of Biodiversity Management Plan and PV Panels pursuant to condition 8 and 9 of planning permission dated 23rd January 2024 (RN: 22/03593/FULL)

    30 Jan 2026 15m away Full applications
  • 26/01982/FULL Awaiting decision

    4A Melina Place London NW8 9SA

    Installation of new vestibule entrance with improved security and other assocoiated works.

    26 Mar 2026 15m away Full applications
  • 25/05125/ADFULL Awaiting decision

    2 Melina Place London NW8 9SA

    Details of photographic samples of the Portland Stone and plans and elevations 1:20 / sections 1:10 of the following parts of the development - any new external windows and doors, rooflight pursuant to Conditions 5 and 6 of planning permission dated 22 April 2025 (RN: 22/03593/FULL)

    23 Jul 2025 15m away Full applications
  • 25/05138/NMA Awaiting decision

    2 Melina Place London NW8 9SA

    Amendments to planning permission dated 6th February 2024 (RN:22/03593/FULL) for Alterations to the existing building including side and rear extensions at ground and first floor, rebuilding of rear extension and creation of basement and lightwells and associated works. Namely, window at the end of the rear extension changed to glazed pivot door, omission of the windows along the lightwell adjacent to the garage, new rooflight above the lightwell adjacent to the garage, flat roof above the semi circular entrance changed to the semi circular domed roof flat skylight above double height entrance changed to a roof lantern and revised internal layout to show the bedroom in the rear extension has been omitted.

    23 Jul 2025 15m away Amendments

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications