Connection of 11 Adelphi Terrace to 2-3 Robert Street at lower basement level, installation of plant, installation of louvres in window frames at lower basement level, creation of new door opening into Lower Robert Street, removal of water tank from roof and removal of rooflights, installation of two vents to roof and vent grille to lightwell elevation, in connection with use as a health spa. (Linked with 25/07873/LBC)

As published by the council, reference 25/07872/FULL

Timeline

Dates from the published record

  1. 30 Oct 2025

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/07873/LBC Awaiting decision

    11 Adelphi Terrace WC2N 6BJ

    Connection of 11 Adelphi Terrace to 2-3 Robert Street at lower basement level, installation of plant, installation of louvres in window frames at lower basement level, creation of new door opening into Lower Robert Street, removal of water tank from roof and removal of rooflights, installation of two vents to roof and vent grille to lightwell elevation. (Linked with 25/07872/FULL)

    30 Oct 2025 0m away Heritage and listed buildings
  • 26/01742/ADFULL Awaiting decision

    11 Adelphi Terrace WC2N 6BJ

    Detailed site investigation of contaminated Land, pursuant to condition 4 of planning permission dated 9th March 2026 (RN 25/07872/FULL)

    18 Mar 2026 2m away Full applications
  • 26/04713/ADLBC Awaiting decision

    11 Adelphi Terrace WC2N 6BJ

    Details of a written scheme of investigation pursuant to condition 3 of listed building dated 9th March 2026 (RN:25/07873/LBC)

    14 Jul 2026 2m away Conditions
  • 26/04467/ADFULL Awaiting decision

    11 Adelphi Terrace WC2N 6BJ

    Details of desktop study and site investigation of contaminated land, pursuant to condition 4 (phase 1, 2 and 3) of planning permission dated 9 March 2026 (RN 25/07872/FULL).

    6 Jul 2026 2m away Full applications
  • 26/03919/FULL Awaiting decision

    11 Adelphi Terrace WC2N 6BJ

    Erection of external plant equipment within acoustic enclosure; retaining wall and metal fence; and associated landscape planting.

    15 Jun 2026 15m away Full applications
  • 26/04530/AD7 Awaiting decision

    2 - 3 Robert Street London WC2N 6BH

    Renewal to display for a temporary period of six months of a non-illuminated 'to let' board attached to the railings in front of the building at street level and measuring 0.6m x 0.45m.

    8 Jul 2026 27m away Advertising

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications