Skip to content
PlanIndex Get alerts
Menu

Planning application

58 Oliphant Street London W10 4EF

Granted Westminster 25/07803/FULL Full Planning Permission Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of roof above double side gate.

As published by the council, reference 25/07803/FULL

Application record

Reference
25/07803/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Application Permitted
Received
28 Oct 2025
Validated
14 Apr 2026
Decided
5 Jun 2026
Ward
Queen's Park
Decision by
Delegated Decision
Postcode
W10 4EF

Timeline

Dates from the published record

  1. 28 Oct 2025

    Received by Westminster

  2. 14 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 5 Jun 2026

    Decision issued: Application Permitted

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 85 Oliphant Street London W10 4EE

    26/02228/FULL Submitted 2 Apr 2026 46m away

    87% historically approved · decision due ~29 Jul

    Retention of roof-mounted photovoltaic (PV) solar panels including associated electrical connections, mounting equipment and ancillary components.

    Awaiting decision Full applications 14 docs
  • 58 Oliphant Street London W10 4EF

    12/00738/FULL Submitted 25 Jan 2012 52m away

    Erection of rear and side single story extensions at ground floor level.

    Granted Full applications Extension 6 docs
  • 70 Oliphant Street London W10 4EF

    06/02739/FULL Submitted 10 Apr 2006 52m away

    Installation of skylights to rear roof of property.

    Granted Full applications 12 docs
  • 70 Oliphant Street London W10 4EF

    06/02749/CLOPUD Submitted 10 Apr 2006 52m away

    Single storey flat roof extension at ground floor level.

    Granted Lawful development Extension 10 docs
    Small domestic
  • 126 Kilburn Lane London W10 4AJ

    26/03441/FULL Submitted 26 May 2026 53m away

    87% historically approved · decision due ~21 Jul

    Construction of a new pedestrian entrance to front boundary wall including construction of new brick pier and alterations to front railings (retrospective)

    Awaiting decision Full applications 10 docs
    Small domestic
  • 128 Kilburn Lane London W10 4AJ

    26/02378/FULL Submitted 10 Apr 2026 57m away

    87% historically approved · decision due ~9 Jul

    Installation of air conditioning unit located on rear garden including new conservation-style rooflight on the rear outrigger roof to provide ventilation and natural light to the main bathroom; and other associated works.

    Awaiting decision Full applications Extension Loft or dormer 12 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications