Planning application
22 Park Street London W1K 2JB
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of arrangements to secure measures to mitigate the potential increased demand for on-street parking pursuant to Condition 10 of planning permission dated 28th August 2025 (RN: 25/04564/FULL)
As published by the council, reference 25/07704/ADFULL
Application record
- Reference
- 25/07704/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 24 Oct 2025
- Validated
- 24 Oct 2025
- Decided
- 12 May 2026
- Ward
- West End
- Decision by
- Delegated Decision
- Postcode
- W1K 2JB
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
26/02743/ADFULL Awaiting decision
22 Park Street London W1K 2JB
Detailed drawings and a bio-diversity management plan in relation to the living green wall pursuant to condition 7 of planning application dated 28th August 2025 (RN: 25/04564/FULL).
Timeline
Dates from the published record
-
24 Oct 2025
Received by Westminster
-
12 May 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,655 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 12 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
22 Park Street London W1K 2JB
88% historically approved · decision due ~19 Jun
Detailed drawings and a bio-diversity management plan in relation to the living green wall pursuant to condition 7 of planning application dated 28th August 2025 (RN: 25/04564/FULL).
Awaiting decision Full applications 5 docs -
Flat 74 Fountain House Park Street London W1K 7HG
88% historically approved · decision due ~29 Apr
Alterations to fenestration and openings to the northern elevation and inwards facing eastern elevation.
Awaiting decision Full applications Windows or glazing 20 docs -
34 Park Street London W1K 2JD
General refurbishment and M&E upgrade of the office building. (Linked to 25/07808/FULL)
Granted Heritage and listed buildings 51 docs -
34 Park Street London W1K 2JD
General refurbishment and M&E upgrade of the office building. (Linked to 25/07809/LBC)
Granted Full applications 54 docs -
34 Park Street London W1K 2JD
93% historically approved · decision due ~15 Sep
Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.
Awaiting decision Amendments Extension Windows or glazing -
34 Park Street London W1K 2JD
89% historically approved · decision due ~30 Sep
Detailed drawings of Intercom and CCTV pursuant to Condition 4 (a) of planning application dated 8th May 2026 (RN: 25/07808/FULL).
Decided
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)