Planning application
25/07700/FULL
Flat 5 24 Kensington Gore London SW7 2ET
Proposal
Erection of roof extension to provide additional residential floorspace at fourth floor level, and alterations including replacement mechanical plant and windows to third and fourth floor maisonette.
As published by the council, reference 25/07700/FULL
Timeline
Dates from the published record
-
24 Oct 2025
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/07839/TCA Awaiting decision
Royal College Of Art Kensington Gore London SW7 2EU
T1 Ginkgo - To crown reduce back to previous points removing approximately 2 meters from the branch tips.
-
26/00674/CLLB Granted
Royal College Of Art Kensington Gore London SW7 2EU
Series of investigative works to the Henry Moore Gallery, and the demolition of a wall in the Darwin building.
-
25/07147/FULL Awaiting decision
Royal College Of Art Kensington Gore London SW7 2EU
Roof extension to the Gulbenkian building and reinstatement of main entrance with new glazed opening and associated access ramp; introduction of new link bridge between Darwin and Frayling buildings; minor extension and new external link stair to the Frayling building; reinstatement and refurbishment of the Darwin glasshouse structure and amendments to the entrance on Jay Mews; installation of plant including ASHPs on the roof of Darwin and associated works across the buildings; repair work to building facades and roofs including removal of Reinforced Autoclaved Aerated Concrete (RAAC) and replacement roofs to the Henry Moore Gallery and Stevens Building; refurbishment of roof terraces including new edge protection where required; other external works including the refurbishment and repair of facades; landscaping works to include extended podium entrance to Darwin Building, seating and planters; and other associated works. (Linked with 25/07148/LBC)
-
26/04978/CLLB Awaiting decision
197 Queen's Gate London SW7 5EU
Internal layout alterations to rear first floor (Stevens Building).
-
25/07148/LBC Awaiting decision
Royal College Of Art Kensington Gore London SW7 2EU
Roof extension to the Gulbenkian building and reinstatement of main entrance with new glazed opening and associated access ramp; introduction of new link bridge between Darwin and Frayling buildings; minor extension and new external link stair to the Frayling building; reinstatement and refurbishment of the Darwin glasshouse structure and amendments to the entrance on Jay Mews; installation of plant including ASHPs on the roof of Darwin and associated works across the buildings; repair work to building facades and roofs including removal of Reinforced Autoclaved Aerated Concrete (RAAC) and replacement roofs to the Henry Moore Gallery and Stevens Building; refurbishment of roof terraces including new edge protection where required; other external works including the refurbishment and repair of facades; landscaping works to include extended podium entrance to Darwin Building, seating and planters; and other associated works. (Linked with 25/07147/FULL)
-
25/05247/FULL Awaiting decision
41 - 43 Jay Mews London SW7 2ES
Refurbishment and extensions to rear; installation of air conditioning unit to east elevation, roof extension and roof lights; access to waste and cycle storage; replacement doors to the front elevation and the creation of a new window on the northern elevation; and other associated works.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.