Planning application
25/07537/FULL
135 - 137 Ebury Street London SW1W 9QU
Proposal
Resubmitted under 25/07644/FULL
As published by the council, reference 25/07537/FULL
Timeline
Dates from the published record
-
17 Oct 2025
Received by Westminster
-
24 Oct 2025
Validated
Checked as complete and ready for consideration.
-
24 Oct 2025
Decision issued: No Further Action
-
21 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/07644/FULL Awaiting decision
135 - 137 Ebury Street London SW1W 9QU
Installation of four external air conditioning units within ground-floor rear courtyard and external ducting to rear elevation (Linked with 25/07645/LBC)
-
25/07645/LBC Awaiting decision
135 - 137 Ebury Street London SW1W 9QU
Installation of four external air conditioning units within ground-floor rear courtyard, external ducting to rear elevation, internal air conditioning units throughout and associated works. Linked with 25/07644/FULL
-
26/02913/FULL Awaiting decision
127 Ebury Street London SW1W 9QU
Amalgamation of first floor flat (Flat B) and second and third floor maisonette (Flat C) to create a three bedroom dwelling, closet wing extension, new sash windows to the rear, rear elevation repairs and improvements, and associated internal alterations. (Linked to 26/02914/LBC)
-
26/02914/LBC Awaiting decision
127 Ebury Street London SW1W 9QU
Amalgamation of first floor flat (Flat B) and second and third floor maisonette (Flat C) to create a three bedroom dwelling, closet wing extension, new sash windows to the rear, rear elevation repairs and improvements, and associated internal alterations. (Linked to 26/02913/FULL)
-
26/01010/FULL Awaiting decision
141 Ebury Street London SW1W 9QW
Erection of a florist kiosk and planters to the forecourt area adjacent 141 Ebury Street for a temporary period of one year.
-
25/05621/ADLBC Refused
Flat 1 Basement And Ground Floor 98 Ebury Street London SW1W 9QD
Details (sections 1:5 and elevations 1:10) of the new windows and doors pursuant to Condition 3 of listed building dated 31 January 2024 (RN: 23/08322/LBC).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.