Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Lord Hills Road London W2 6PD

Granted Westminster 25/07513/FULL Full Planning Permission Application

Works: Extension Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a first floor side extension with roof terrace above, replacement of main roof with a flat roof, external cladding and installation of new windows and doors.

As published by the council, reference 25/07513/FULL

Application record

Reference
25/07513/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
16 Oct 2025
Validated
21 Oct 2025
Decided
12 Mar 2026
Ward
Westbourne
Decision by
Delegated Decision
Postcode
W2 6PD

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 26/05870/FULL Awaiting decision

    2 Lord Hills Road London W2 6PD

    Erection of a first floor side and part rear extension with roof terrace above, replacement of main roof with a flat roof, external cladding and installation of new windows and doors.

    Submitted 26 Aug 2026 Full applications

Timeline

Dates from the published record

  1. 16 Oct 2025

    Received by Westminster

  2. 21 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 12 Mar 2026

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

34 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 12 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 2 Lord Hills Road London W2 6PD

    26/05870/FULL Submitted 26 Aug 2026 50 yards away

    87% historically approved · decision due ~21 Oct

    Erection of a first floor side and part rear extension with roof terrace above, replacement of main roof with a flat roof, external cladding and installation of new windows and doors.

    Awaiting decision Full applications Extension Windows or glazing
  • Rowington Close London

    22/04405/TCA Submitted 4 Jul 2022 100 yards away

    2x tree groups (G70 on plan, Elder and Norway Maple and G88 on plan, Sycamore): fell

    Granted Trees 10 docs
  • St Mary Magdalene Church Rowington Close London W2 5TF

    25/08688/ADV Submitted 27 Nov 2025 100 yards away

    Display of 4 non illuminated fascia signs, 1 x totem sign, 2 x hoarding type signs and 2 x vinyl signs.

    Granted Advertising 11 docs
  • St Mary Magdalene Church Rowington Close London W2 5TF

    20/06186/ADV Submitted 2 Oct 2020 100 yards away

    Display of two non-illuminated fascia signs measuring 0.17m x 1.7m, one non-illuminated projecting sign measuring 0.29m x 0.29m.

    Granted Advertising 17 docs
  • St Mary Magdalene Church Rowington Close London W2 5TF

    26/00824/FULL Submitted 11 Feb 2026 100 yards away

    87% historically approved · decision due ~8 Apr

    Installation of six wall lightings to north elevation

    Awaiting decision Full applications 12 docs
  • 66 Atherstone Court Delamere Terrace London W2 6PN

    25/08327/FULL Submitted 14 Nov 2025 150 yards away

    87% historically approved · decision due ~9 Jan

    Installation of wheelchair platform lift, rebuilding of steps, and associated works.

    Awaiting decision Full applications 9 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06317/FULL Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications