Planning application
25/07511/ADFULL
9 - 12 Bow Street London WC2E 7AA
Proposal
Details of typical existing and proposed detailed drawings: section (1:5) and elevation (1:10) of all new external doors and windows pursuant to condition 4 of planning permission dated 7th August 2024 (RN:24/03728/FULL)
As published by the council, reference 25/07511/ADFULL
Timeline
Dates from the published record
-
16 Oct 2025
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/07946/NMA Awaiting decision
9 - 12 Bow Street London WC2E 7AA
Amendments to planning permission dated 07 August 2024 (RN: 24/03728/FULL) for external works to the front elevation, including the replacement of the front entrance and the existing sash windows on the upper floors. Alterations to rear elevation with new stair core glazing system and additional hard and soft landscaping to first floor terrace. Installation of new plant equipment and acoustic screening at roof level and other associated works. Namely, to allow amendments to the external finish of the office entrance; Reinstatement of an intercom panel by the office door; and the style of the external lighting located on the office entrance.
-
26/00472/FULL Granted
61 - 62 Long Acre London WC2E 9JL
Retention of roof level plant, condensers, AOV and rooflight, and erection of a replacement plant screen.
-
26/00473/LBC Granted
61 - 62 Long Acre London WC2E 9JL
Retention of roof level plant, condensers, AOV and rooflight, and erection of a replacement plant screen.
-
26/03572/ADV Awaiting decision
63 Long Acre London WC2E 9JE
Display of one non illuminated fascia sign measuring 0.172m x 1.966m and one non illuminated projecting sign measuring 0.6m x 0.6m.
-
26/03980/FULL Awaiting decision
63 Long Acre London WC2E 9JE
Installation of five plain awnings to the ground floor facades.
-
25/08801/ADFULL Refused
Ground Floor 11 - 13 Broad Court London WC2B 5PY
Details of cycle storage and waste storage pursuant to Conditions 3 and 4 of planning permission dated 30 September 2024 (RN: 24/03422/FULL).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.