Planning application
72 Eccleston Square London SW1V 1PJ
Works: Loft or dormer
Relates to 25/07475/FULL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of photovoltaic panels at main mansard roof level and to rear first floor flat roof.
As published by the council, reference 25/07476/LBC
Application record
- Reference
- 25/07476/LBC
- Type
- Listed Building Consent Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 15 Oct 2025
- Validated
- 4 Nov 2025
- Decided
- 19 Feb 2026
- Ward
- Pimlico North
- Decision by
- Delegated Decision
- Postcode
- SW1V 1PJ
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
25/07475/FULL Granted
72 Eccleston Square London SW1V 1PJ
Installation of photovoltaic panels at main mansard roof level and to rear first floor flat roof.
Timeline
Dates from the published record
-
15 Oct 2025
Received by Westminster
-
4 Nov 2025
Validated
Checked as complete and ready for consideration.
-
19 Feb 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
25/07475/FULL Granted
72 Eccleston Square London SW1V 1PJ
Installation of photovoltaic panels at main mansard roof level and to rear first floor flat roof.
1 later application on the register refers to this one:
-
25/07475/FULL Granted
72 Eccleston Square London SW1V 1PJ
Installation of photovoltaic panels at main mansard roof level and to rear first floor flat roof.
Documents
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 19 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
72 Eccleston Square London SW1V 1PJ
Installation of photovoltaic panels at main mansard roof level and to rear first floor flat roof.
Granted Full applications Loft or dormer 25 docs -
Flat 2 71 Eccleston Square London SW1V 1PJ
Internal alterations.
Refused Heritage and listed buildings 11 docs -
Flat 2 71 Eccleston Square London SW1V 1PJ
Creation of an open plan kitchen by creating an opening in a non supporting wall, raising a plaster ceiling, and laying of a wooden floor with acoustic isolation.
Granted Heritage and listed buildings 13 docs -
Flat 1 71 Eccleston Square London SW1V 1PJ
Internal partitions to form a new bedroom within the lower ground floor flat.
Granted Heritage and listed buildings 9 docs -
70 Eccleston Square London SW1V 1PJ
Removal of flat infill roof and reinstatement of inner roof pitches including new roof coverings.
Granted Heritage and listed buildings Extension Roofing 22 docs -
Fourth Floor 70 Eccleston Square London SW1V 1PJ
Alterations to roof and loft area to create habitable floor level including additional bedroom and ancillary space.
Refused Full applications 19 docs
Other heritage and listed building applications
In Westminster
-
26/06288/LBC Decided
Barness Court 6 - 8 Westbourne Terrace London W2 3UW
Installation of a gas pipework to south elevation and wall. (Linked with 26/06287/FULL)
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)