Planning application

19A Orsett Terrace London W2 6AJ

Granted Westminster 25/07167/FULL Full Planning Permission Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Lowering of the existing front cellar floor level, removal of the vault's doors brick lower door section and insert timber sash windows. (Linked to 25/07168/LBC)

As published by the council, reference 25/07167/FULL

Application record

Reference
25/07167/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Application Permitted
Received
6 Oct 2025
Validated
10 Feb 2026
Decided
11 May 2026
Ward
Bayswater
Decision by
Delegated Decision
Postcode
W2 6AJ

Timeline

Dates from the published record

  1. 6 Oct 2025

    Received by Westminster

  2. 10 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 May 2026

    Decision issued: Application Permitted

  4. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Thornton Heath

2 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 19A Orsett Terrace London W2 6AJ

    25/07168/LBC Submitted 6 Oct 2025 1m away

    Lowering of the existing front cellar floor level, removal of the vault's doors brick lower door section and insert timber sash windows. Internal alterations. (Linked to 25/07167/FULL)

    Granted Heritage and listed buildings Windows or glazing 22 docs
  • 21D Orsett Terrace London W2 6AJ

    26/01263/LBC Submitted 27 Feb 2026 6m away

    90% historically approved · decision due ~24 Apr

    Refurbishment of kitchen and bathroom; replacement of flooring, replacement of boiler and repair to drainage pipework (Retrospective)

    Awaiting decision Heritage and listed buildings 14 docs
  • 30B Orsett Terrace London W2 6AJ

    25/06966/FULL Submitted 29 Sep 2025 30m away

    Replacement of the sashes within the retained box frames of four windows (two to the front elevation at first floor and two to the rear at ground and first floor levels) and including associated refurbishment works, and refurbishment of existing retained front ground floor windows. (Linked with 25/06967/LBC)

    Granted Full applications Windows or glazing 34 docs
  • 30B Orsett Terrace London W2 6AJ

    25/06967/LBC Submitted 29 Sep 2025 30m away

    Replacement of the sashes within the retained box frames of four windows (two to the front elevation at first floor and two to the rear at ground and first floor levels) and including associated refurbishment works, and refurbishment of existing retained front ground floor windows. (Linked with 25/06966/FULL)

    Granted Heritage and listed buildings Windows or glazing 31 docs
  • 54 Gloucester Gardens London W2 6BN

    25/06973/LBC Submitted 29 Sep 2025 34m away

    Installation of timber glazed double doors to lobby area within ground floor entrance.

    Granted Heritage and listed buildings Windows or glazing 16 docs
  • 207 Gloucester Terrace London W2 6HX

    26/04178/FULL Submitted 24 Jun 2026 65m away

    87% historically approved · decision due ~19 Aug

    Use of lower floor storage as a self contained residential unit (Class C3); alteration of the side garden level to form a lightwell on the lower ground floor; and alteration to the fenestration to open up pre-existing bricked-up fenestration.

    Awaiting decision Full applications Windows or glazing

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications