Skip to content
PlanIndex Get alerts
Menu

Planning application

Westminster Bridge Public Convenience Westminster Pier Victoria Embankment London SW1A 2JH

Granted Westminster 25/07144/COLBC LBC Applic. Council's Own Dev.

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of existing external doors and overpanels, new illuminated wayfinding signage, replacement of ventilation louvre and installation of waterproofing to internal face of embankment wall.

As published by the council, reference 25/07144/COLBC

Application record

Reference
25/07144/COLBC
Type
LBC Applic. Council's Own Dev.
Status
Decided
Decision
Granted As published: Application Permitted
Received
3 Oct 2025
Validated
9 Oct 2025
Decided
13 Feb 2026
Ward
St James's
Decision by
Delegated Decision
Postcode
SW1A 2JH

Timeline

Dates from the published record

  1. 3 Oct 2025

    Received by Westminster

  2. 9 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 13 Feb 2026

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Hugh Broughton Architects Agent, an architecture practice registered in London

Active · incorporated 2003 · London

13 applications on PlanIndex · across 3 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 13 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Commissioners' Yard Gate Victoria Embankment London

    26/03719/NMA Submitted 8 Jun 2026 50 yards away

    93% historically approved · decision due ~3 Aug

    Amendments to planning permission dated 29th November 2022 (RN:22/07412/FULL) for temporary removal and storage of the southern pedestrian gate forming part of Commissioners' Yard Gate and installation of two turnstiles forming a temporary pedestrian entrance, and associated works. Namely, to amend the wording of the condition to be amended as follows: The temporary removal and storage of the southern pedstrian gates and surrounding Yorkstone pavers allowed by this permission can continue until 31 December 2027. After that, the temporary pedestrian turnstiles and associated ancillary structures must be removed. You must then re-instate the gates and pavers and return the entrance and land to its previous condition and use.

    Awaiting decision Amendments 5 docs
  • Commissioners' Yard Gate Victoria Embankment London

    26/03670/LBC Submitted 4 Jun 2026 50 yards away

    90% historically approved · decision due ~30 Jul

    Variation of condition 2 of listed building consent dated 22 December 2022 (RN: 22/07413/LBC) for the temporary removal and storage of the southern pedestrian gate forming part of Commissioners' Yard Gate and installation of two turnstiles forming a temporary pedestrian entrance, and associated works; NAMELY, to extend the end date to 31 December 2027 to cover the end of the works and necessary road closures.

    Awaiting decision Heritage and listed buildings 8 docs
  • Norman Shaw Building South Victoria Embankment London SW1A 2HZ

    26/02165/LBC Submitted 31 Mar 2026 100 yards away

    90% historically approved · decision due ~26 May

    Replacement and installation of electronic access control systems to Norman Shaw South.

    Awaiting decision Heritage and listed buildings 1 doc
  • Norman Shaw Building South Victoria Embankment London SW1A 2HZ

    26/05970/LBC Submitted 1 Sep 2026 100 yards away

    90% historically approved · decision due ~27 Oct

    Replacement and installation of 16 electronic access control systems to Norman Shaw South

    Decided Heritage and listed buildings
  • Commissioners' Yard Gate Victoria Embankment London

    26/03718/NMA Submitted 8 Jun 2026 100 yards away

    93% historically approved · decision due ~3 Aug

    Amendments to planning permission dated 29th December 2022 (RN:22/07334/FULL) for variation of Conditions 3 and 10 of planning permission dated 16 August 2018 (RN:18/05074/FULL) for temporary removal and storage of the Commissioners' Yard Gate and installation of a temporary vehicular entrance; to extend the period for which the Comissioners' Yard Gate central gate can be temporarily removed and stored. Namely, to amend the wording of the condition to be amended as follows;The temporary removal and storage of the Commissioners' Yard Gates allowed by this permission can continue until 31 December 2027. After that, the temporary vehicular entrance, including the 'tiger trap' and personnel box, must be removed. You must then re-instatement the original Commisioners' Yard Gates, gate posts and flanking panels and return the entrance and land to its previous condition and use.

    Awaiting decision Amendments 6 docs
  • Norman Shaw North Parliamentary Victoria Embankment London SW1A 2TT

    25/02929/ADLBC Submitted 28 Apr 2025 100 yards away

    Details of lift entrance, internal and external decorative schemes, and finishes in new western entrance lobby, pursuant to Conditions 3(ix) and 5(a) and (l) of listed building consent dated 9 August 2021 (RN 21/02100/LBC)

    Granted Conditions 4 docs

In Westminster

  • 26/06288/LBC Decided

    Barness Court 6 - 8 Westbourne Terrace London W2 3UW

    Installation of a gas pipework to south elevation and wall. (Linked with 26/06287/FULL)

    Received 14 Sep, published by the council 21 Sep 2026 Heritage and listed buildings
  • 26/07529/LBC Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)

    Received 5 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07509/LBC Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)

    Received 4 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07473/LBC Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)

    Received 3 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07471/LBC Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings