Planning application
25/07130/FULL
3 Great Chapel Street London W1F 8FL
Proposal
Shopfront Alterations. (Linked with 25/07131/ADV)
As published by the council, reference 25/07130/FULL
Timeline
Dates from the published record
-
3 Oct 2025
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/07131/ADV Awaiting decision
3 Great Chapel Street London W1F 8FL
Display of a halo illuminated fascia sign measruing 0.33m x 1.30m; an externally illuminated projecting sign measurting 0.75m x 0.55m; and a canvas awning measuring 3.84m x 1.50m. (Linked with 25/07130/FULL)
-
25/05189/ADV Granted
95 - 97 Dean Street London W1D 3SY
Display of three internally illuminated fascia signs measuring 0.33m x 3.915m, 0.25m x 2.28m, and one non illuminated projecting sign measuring 0.75m x 0.55m. Linked with 25/05188/FULL
-
25/05188/FULL Granted
95 - 97 Dean Street London W1D 3SY
Alterations to shopfront including installation of a solid metal stall riser; metal side panels to both sides of the central entrance doors; New powder coated aluminium framed glazing with tinted glass; awning and signage; and other associated works. Linked with 25/05189/ADV
-
26/01838/LBC Awaiting decision
24 Great Chapel Street London W1F 8FS
Replace 4 ground level grilles like for like (positioned within arches) on the Hollen Street elevation
-
26/03535/ADV Awaiting decision
West End House 91 - 92 Dean Street London W1D 3SY
Display of temporary non illuminated printed dibond hoarding to five window reveals measuring 2.245m x 2.395m, 2.245m x 1.305, 2.245m x 2.395m, 2.24m x 2.39m, 2.245m x 2.395m. (Retrospective)
-
26/01220/ADV Granted
West End House 91 - 92 Dean Street London W1D 3SY
Display of five non-illuminated dibond panels measuring, three measuring 2.245m x 2.395m, one measuring 2.245m x 1.305m, and one measuring 2.24m x 2.39m.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.