Planning application
8 Whistler Square London SW1W 8BW
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of existing uplighters between each of the perimeter columns to the Level 6 terrace with uplighters either side of columns.
As published by the council, reference 25/07106/FULL
Application record
- Reference
- 25/07106/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 2 Oct 2025
- Validated
- 2 Oct 2025
- Decided
- 17 Feb 2026
- Ward
- Knightsbridge & Belgravia
- Decision by
- Delegated Decision
- Postcode
- SW1W 8BW
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2025: 1 approved, 0 refused.
-
26/02758/FULL Awaiting decision
8 Whistler Square London SW1W 8BW
Erection of a pergola on the south east corner of 6th floor terrace.
-
26/02759/FULL Awaiting decision
8 Whistler Square London SW1W 8BW
Erection of decorative privacy screens on the east and west elevations of 6th floor terrace.
Timeline
Dates from the published record
-
2 Oct 2025
Received by Westminster
-
17 Feb 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Newmark LLP Agent
925 applications on PlanIndex · across 40 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 17 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8 Whistler Square London SW1W 8BW
88% historically approved · decision due ~19 Jun
Erection of a pergola on the south east corner of 6th floor terrace.
Awaiting decision Full applications 15 docs -
8 Whistler Square London SW1W 8BW
88% historically approved · decision due ~19 Jun
Erection of decorative privacy screens on the east and west elevations of 6th floor terrace.
Awaiting decision Full applications 20 docs -
Development Site At Chelsea Barracks Chelsea Bridge Road London
88% historically approved · decision due ~13 Oct
Details confirming archaeological work carried out during Phase 4, pursuant to Condition 13 (part c) of planning permission dated 16 November 2018 (RN 18/04103/OUT).
Awaiting decision Full applications 8 docs -
Development Site At Chelsea Barracks Chelsea Bridge Road London
Request for a screening opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for the proposed variation of conditions attached to planning permission dated 16 November 2018 (RN 18/04103/OUT) (as amended by decision dated 23 January 2025, RN 24/08839/NMA) for: "Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) which itself varied conditions 1, 26, 53, 54 and 55 of planning permission dated 27 September 2016 (RN: 16/04998/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (Class C3), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings. Namely, amendments including adjustment of parameter lines to P21 to form 2 plots, P21a and P21b; addition of 1.3m wide Zone of Horizontal Deviation for Articulation on P21b and P22; extension of the Zone of Horizontal Deviation to enable infill to rear of P21 on all levels and to the rear of B15 by 3.4m; and increase in the maximum number of affordable housing units from 123 to 126." Namely, to allow for amendments to Phase 5 of the development so that it can deliver up to 100 apartments across three blocks (rather than 20 townhouses as consented).
Decided Outline New dwelling Extension +1 4 docsMajor scheme -
105 - 107 Pimlico Road London SW1W 8PH
Display of non-illuminated fascia sign measuring 0.29 m x 2.31 m.
Decided Advertising 14 docs -
85 Pimlico Road London SW1W 8PH
Display of 8 decorated trees with Illuminated boxes; 7 lamppost festive motif (Christmas trees) and 4 cross street displays for a temporary period from 29 October 2025 to 29 January 2026.
Granted Advertising Trees 18 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)