Skip to content
PlanIndex Get alerts
Menu

Planning application

25/07049/ADFULL

7A Mozart Street London W10 4LA

Awaiting decision Westminster Approval of Details (Full PP)

Proposal

Detailed drawings and a bio-diversity management plan in relation to living green sedum roof pursuant to condition 5 of planning permission dated 27th June 2025 (RN:25/00165/FULL).

As published by the council, reference 25/07049/ADFULL

Timeline

Dates from the published record

  1. 1 Oct 2025

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/02416/FULL Awaiting decision

    2 Mozart Street London W10 4LA

    Replacement of existing single glazed timber framed sash and casement windows with new double glazed timber framed sash and casement windows to match existing style and opening, replacement of existing zinc flat roof with new 3 layer felt flat roof with thermal insulation to achieve Part L of the Building Regulations.

    13 Apr 2026 25m away Full applications
  • 25/06594/FULL Awaiting decision

    2 Mozart Street London W10 4LA

    Replacement of existing single glazed timber widows to double glazed uPVC windows. Replacement of zinc flat roof with thermal insulation to achieve Park L and new 3 layer felt flat roof (height increase by approx. 0.300m) to include rear additions.

    15 Sep 2025 27m away Full applications
  • 25/05046/FULL Awaiting decision

    Ground Floor 7 Mozart Street London W10 4LA

    Alterations to front elevation to form new entrance door and two windows at ground floor level and replacement pavement light in connection with the use of ground floor as residential (Class C3). Proposed: Alterations to front elevation to form new entrance door and two windows on front elevation at ground floor level and replacement pavement light in connection with the use of ground floor and basement as residential (Class C3). (Site include Ground Floor and Basement 7 Mozart)

    21 Jul 2025 34m away Full applications
  • 25/07162/COFUL Awaiting decision

    88 Bravington Road London W9 3AL

    Replacement of 4 NR Front elevation existing timber windows with new double glazed timber units. Installation of 4 Nr air bricks to front elevation to vent server room and prevent overheating. Replacement of dormer window to side elevation facing north with new double timber door to allow easier flat roof access for maintenance. Replacement of rear nursery doors with new Aluminium units.

    3 Oct 2025 54m away Full applications
  • 26/01023/FULL Awaiting decision

    72A Bravington Road London W9 3AJ

    Erection of ground floor side infill extension, excavation of front garden and associated works.

    17 Feb 2026 72m away Full applications
  • 26/04529/FULL Awaiting decision

    103 Bravington Road London W9 3AS

    Modification of existing single storey rear extension and removal of chimney stack.

    8 Jul 2026 82m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications