Planning application
25/07047/ADFULL
32 Clifton Gardens London W9 1AU
Proposal
Details of existing and proposed rear door purusant to Condition 8 of planning permission dated 22 October 2024 (RN24/03720/FULL)
As published by the council, reference 25/07047/ADFULL
Timeline
Dates from the published record
-
1 Oct 2025
Received by Westminster
-
7 Oct 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04916/TCA Awaiting decision
Open Space Clifton Gardens London W9 1AL
t1 sorbus fell 7 replant damaging wall and leaning across the footpath t2 sorbus crown reduc eby 2-3 meters & shape t3 as above reason on going maintenence
-
25/08368/FULL Awaiting decision
37 Clifton Gardens London W9 1AR
Installation of new Air Source Heat Pump system with two external units located on the main roof within acoustic enclosures.
-
26/01149/CLOPUD Granted
37 Clifton Gardens London W9 1AR
Installation of one air source heat pump located on the main roof within an acoustic enclosure.
-
25/06666/TDD Awaiting decision
56 Clifton Gardens London W9 1AU
Removal of false acacia tree located in the front garden.
-
26/01981/TCA Granted
19B Clifton Gardens London W9 1AR
1 x sycamore (smaller tree) : crown reduce by 30%, pruning back to suitable growth points and shaping crown. Cut back from property to give 2m clearance. Crown lift by 1-2m. Remove dead wood and epicormic growth.
-
26/01616/TPO Awaiting decision
19B Clifton Gardens London W9 1AR
TPO sycamore located in the Little Venice TCA are , the upper communal garden directly adjacent to Clifton Gardens , next to a smaller sycamore tree lacking a TPO. The Works are for maintenance purposes only and comprise of: - crown reduction of 30% - pruning back to suitable growth points and shaping crown - cut back to give 2 meter clearance from the grade 2 listed Building (ID:31/25) - lift by 1-2 meters - remove dead wood, basal and epicormic growth - all works in accordance with and as per BS 3998:2010
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.