Planning application
25/07013/FULL
143 New Bond Street London W1S 2TP
Proposal
Provision of a new external metal escape staircase from the second to ground floors on the side external wall of 143 New Bond Street in the shared private alley between 143 and 144 New Bond Street. (Linked with 25/07014/LBC)
As published by the council, reference 25/07013/FULL
Timeline
Dates from the published record
-
30 Sep 2025
Received by Westminster
-
6 Oct 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/08781/ADV Granted
143 New Bond Street London W1S 2TP
Display of one non illuminated double sided flag measuring 3m x 1.1m.
-
25/07014/LBC Awaiting decision
143 New Bond Street London W1S 2TP
Provision of a new external metal escape staircase from the second to ground floors on the side external wall of 143 New Bond Street in the shared private alley between 143 and 144 New Bond Street. (Linked with 25/07013/FULL)
-
25/08736/LBC Granted
143 New Bond Street London W1S 2TP
Display of new flag onto existing flagpole at 143 New Bond Street.
-
26/00033/LBC Granted
144 - 146 New Bond Street London W1S 2TR
Internal alterations to front part of 4th and 5th floors to merge 2 existing rooms into single large open plan offices. Existing lighting and services to be adapted and re-used, with additional lighting and power added where required. Removal of one toilet at 4th floor to be replaced by a small stockroom. Internal alterations to rear part of the basement to allocate a portion of an existing stockroom as a new locker room for staff.
-
26/04043/LBC Awaiting decision
144 - 146 New Bond Street London W1S 2TR
Installation of a temporary full facade cover to the principal street elevation of 144 - 146 New Bond Street, associated with the Gucci campaign.
-
26/04040/ADV Awaiting decision
144 - 146 New Bond Street London W1S 2TR
Display of a temporary full facade cover to the principal street elevation of 144 - 146 New Bond Street measuring 16.118m X 12.462m
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.