Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 12 89 - 91 St George's Square London SW1V 3QW

Granted Westminster 25/06564/FULL Full Planning Permission Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of the fifth floor terrace doors with bi-fold doors and the installation of additional roof insulation.

As published by the council, reference 25/06564/FULL

Application record

Reference
25/06564/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
15 Sep 2025
Validated
15 Sep 2025
Decided
30 Oct 2025
Ward
Pimlico South
Decision by
Delegated Decision
Postcode
SW1V 3QW

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/06565/LBC Granted

    Flat 12 89 - 91 St George's Square London SW1V 3QW

    Replacement of the fifth floor terrace doors with bi-fold doors and the installation of additional roof insulation.

    Decided 30 Oct 2025 Heritage and listed buildings

Timeline

Dates from the published record

  1. 15 Sep 2025

    Received by Westminster

  2. 30 Oct 2025

    Decision issued: Application Permitted

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Loxton & Associates Agent

3 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 30 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Flat 12 89 - 91 St George's Square London SW1V 3QW

    25/06565/LBC Submitted 15 Sep 2025 50 yards away

    Replacement of the fifth floor terrace doors with bi-fold doors and the installation of additional roof insulation.

    Granted Heritage and listed buildings Windows or glazing 15 docs
  • 47 Aylesford Street SW1V 3RY

    26/01499/FULL Submitted 9 Mar 2026 50 yards away

    88% historically approved · decision due ~8 May

    Replacement of existing roof coverings with natural slate and installation of four conservation rooflights: two to front roof slope and two to rear.

    Awaiting decision Full applications Loft or dormer 7 docs
  • St Saviours Church St George's Square London SW1V 3QW

    26/05459/CLLB Submitted 10 Aug 2026 50 yards away

    89% historically approved · decision due ~5 Oct

    Repainting of the lettering to the inscription panels of the war memorial.

    Decided
  • 103 St George's Square Mews London SW1V 3RZ

    26/06174/FULL Submitted 9 Sep 2026 50 yards away

    88% historically approved · decision due ~4 Nov

    Creation of rear roof terrace on top of existing rear extension.

    Decided Full applications Extension
  • 103 St George's Square Mews London SW1V 3RZ

    26/05346/CLOPUD Submitted 6 Aug 2026 50 yards away

    84% historically approved · decision due ~1 Oct

    Installation of three painted timber sash windows within new openings to the rear elevation.

    Decided Lawful development Windows or glazing
  • 103 St George's Square Mews London SW1V 3RZ

    26/01650/FULL Submitted 13 Mar 2026 50 yards away

    88% historically approved · decision due ~8 May

    Erection of a mansard roof extension and alterations to front and rear elevations.

    Awaiting decision Full applications Extension Loft or dormer 21 docs

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications