Skip to content
PlanIndex Get alerts
Menu

Planning application

2 Harewood Place London W1S 1BX

Granted Westminster 25/06426/ADFULL Approval of Details (Full PP)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Detailed drawings including sections and details of materiality of the new entrance door, stone portal at entrance forecourt, new globe light, wall lights and details of the proposed marble lining must be provided in context showing the junction of the door with the existing building, including sections where relevant pursuant to condition 4 and 5 of planning permission dated 22nd May 2025 (RN:24/09015/FULL)

As published by the council, reference 25/06426/ADFULL

Application record

Reference
25/06426/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Granted As published: Application Permitted
Received
9 Sep 2025
Validated
9 Sep 2025
Decided
26 Sep 2025
Ward
West End
Decision by
Delegated Decision
Postcode
W1S 1BX

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/08304/FULL Granted

    2 Harewood Place London W1S 1BX

    Installation of extract duct and associated external works.

    Decided 26 Mar 2026 Full applications

Timeline

Dates from the published record

  1. 9 Sep 2025

    Received by Westminster

  2. 26 Sep 2025

    Decision issued: Application Permitted

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Newmark LLP Agent

925 applications on PlanIndex · across 40 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 26 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 2 Harewood Place London W1S 1BX

    25/08304/FULL Submitted 13 Nov 2025 50 yards away

    Installation of extract duct and associated external works.

    Granted Full applications 21 docs
  • 287 - 291 Oxford Street London W1C 2DR

    25/07161/ADV Submitted 3 Oct 2025 50 yards away

    Display of non illuminated other sign measuirng 6.257m x 0.105m and non illuminated fascia sign measuring 6m x 0.9m

    Granted Advertising 15 docs
  • 285 Oxford Street London W1C 2DW

    26/04868/ADV Submitted 21 Jul 2026 50 yards away

    82% historically approved · decision due ~15 Sep

    Display of internally illuminated 3D detailing and graphics measuring 9.076m x 8.7m attached to the upper floors of the building for a temporary period from 31st August 2026 until 30th August 2027.

    Awaiting decision Advertising
  • Mimosa House 12 Princes Street London W1B 2LL

    26/03075/ADFULL Submitted 11 May 2026 50 yards away

    88% historically approved · decision due ~6 Jul

    Details of an updated version of the Whole Life Carbon Assessment hereby approved at each of the following stages of development prior to commencement of any work on site including all works of deconstruction and demolition pursuant to condition 24 (A) of planning permission dated 17th March 2026 (RN:24/06571/FULL)

    Awaiting decision Full applications Demolition 8 docs
  • Mimosa House 12 Princes Street London W1B 2LL

    26/03074/ADFULL Submitted 11 May 2026 50 yards away

    88% historically approved · decision due ~6 Jul

    Details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement guidance shall be submitted to us and approved by us in writing; pursuant to condition 25(a) of planning permission dated 17th March 2026 (RN 24/06571/FULL)

    Awaiting decision Full applications Demolition 4 docs
  • 283 Oxford Street London W1C 2DN

    04/01899/ADV Submitted 11 Mar 2004 50 yards away

    Display of halo illuminated fascia sign and projecting sign.

    Granted Advertising 4 docs

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications