Planning application
25/06343/COFUL
37B Barnsdale Road London W9 3LL
Proposal
Replacement of existing windows with double glazed timber windows.
As published by the council, reference 25/06343/COFUL
Timeline
Dates from the published record
-
5 Sep 2025
Received by Westminster
-
23 Sep 2025
Validated
Checked as complete and ready for consideration.
-
11 Nov 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/01028/FULL Awaiting decision
47 Barnsdale Road London W9 3LL
Demolition of the existing rear addition to the property located within the garden, reconstruction of a new rear addition extended 1m in depth from the original footprint of the existing, construction of a side infill extension to ground floor only, modification of the internal layout to create two flats with three bedrooms respectively. Introduction of retrofit measures to improve the energy efficiency such as solar panels, internal and external wall insulation to the rear of the existing retained structure.
-
26/01028/COFUL Awaiting decision
47 Barnsdale Road London W9 3LL
Demolition of the existing rear addition to the property located within the garden, reconstruction of a new rear addition extended 1m in depth from the original footprint of the existing, construction of a side infill extension to ground floor only, modification of the internal layout to create two flats with three bedrooms respectively. Introduction of retrofit measures to improve the energy efficiency such as solar panels, internal and external wall insulation to the rear of the existing retained structure.
-
26/01027/COFUL Awaiting decision
45 Barnsdale Road London W9 3LL
Demolition of existing rear addition to the property located within the garden; reconstruction of a new rear addition extended 1m in depth from the original footprint of the existing; construction of a side infill extension to ground floor only; modification of the internal layout to create two flats with three bedrooms respectively; introduction of retrofit measures to improve energy efficiency such as solar panels, internal and external wall insulation to the rear of the existing retained structure.
-
26/04158/FULL Awaiting decision
50A Warlock Road London W9 3LW
Erection of a single-storey rear extension with an infill extension at lower ground floor level; replacement of existing rear window with a door at upper ground floor level; and formation of a small balcony above the rear extension at upper ground floor level.
-
26/03246/FULL Awaiting decision
58A Warlock Road London W9 3LW
Erection of a ground floor side infill extension, rear facade alterations,
-
26/02757/TPO Awaiting decision
8 Abinger Mews W9 3SP
T2 Sorbus (Rowan): Fell to ground level The proposed removal is justified on arboricultural grounds due to the presence of a decay causing fungus affecting the structural integrity of the tree. Retention would present an unacceptable level of risk in its current location.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.