Planning application
110 Lothrop Street London W10 4JA
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement windows with new timber framed, double glazed box sash and casement units.
As published by the council, reference 25/06271/FULL
Application record
- Reference
- 25/06271/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 4 Sep 2025
- Validated
- 4 Sep 2025
- Decided
- 17 Oct 2025
- Ward
- Queen's Park
- Decision by
- Delegated Decision
- Postcode
- W10 4JA
Timeline
Dates from the published record
-
4 Sep 2025
Received by Westminster
-
17 Oct 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Dovetail Building Consultants Ltd Agent, registered in Corsham
Active · incorporated 2013 · Corsham
9 applications on PlanIndex · across 8 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 17 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
96 Marne Street London W10 4JG
New glazed roof to the existing rear extension, two new conservation skylights to rear roofslope, new window to rear ground floor level and replacement of windows from UPVC to timber slimline double glazed windows.
Granted Full applications Extension Windows or glazing 14 docs -
101 Fifth Avenue London W10 4DR
Installation of single glazed timber sash windows to first floor level.
Granted Heritage and listed buildings Windows or glazing 12 docs -
94 Sixth Avenue London W10 4HJ
88% historically approved · decision due ~28 Apr
Replacement of existing windows to front and rear.
Awaiting decision Full applications Windows or glazing 9 docs -
70 Sixth Avenue London W10 4HE
Erection of a single-storey rear infill extension.
Refused Full applications Extension 15 docsSmall domestic -
76 Sixth Avenue London W10 4HE
Single storey ground floor infill extension at rear of property.
Granted Lawful development Extension 6 docsSmall domestic -
76 Sixth Avenue London W10 4HE
Erection of a single storey rear extension at ground floor level.
Refused Full applications Extension 6 docsSmall domestic
Other full applications
In Westminster
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07470/FULL Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement. (Linked with 26/07471/LBC).
-
26/07466/FULL Awaiting decision
65 Albion Gate Albion Street W2 2LA
Replacement of first-floor front elevation windows and balcony door with double-glazed steel-framed units.
-
26/07481/FULL Awaiting decision
1 Loudoun Road London NW8 0LH
Minor alterations to fenestration in connection with internal remodelling, including the upgrading of external windows to the north rear classroom block and localised alterations to window sill heights.