Planning application
Regent's University London Inner Circle Regents Park London NW1 4NS
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of secondary glazing.
As published by the council, reference 25/06182/LBC
Application record
- Reference
- 25/06182/LBC
- Type
- Listed Building Consent Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 1 Sep 2025
- Validated
- 1 Sep 2025
- Decided
- 23 Oct 2025
- Ward
- Regent's Park
- Decision by
- Delegated Decision
- Postcode
- NW1 4NS
Site history
Applications at this address on the Westminster register
This site has had 3 applications since 2025: 3 approved, 0 refused.
-
25/05742/FULL Granted
Regent's University London Inner Circle Regents Park London NW1 4NS
Installation of two air conditioning condenser units to flat roof.
-
25/05115/TCA Granted
Regent's University London Inner Circle Regents Park London NW1 4NS
2 x cherry (T1&T2): Fell
Timeline
Dates from the published record
-
1 Sep 2025
Received by Westminster
-
23 Oct 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Studio Gunn Agent
8 applications on PlanIndex · across 4 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 23 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Regent's University London Inner Circle Regent's Park London NW1 4NS
88% historically approved · decision due ~20 May
Replacement of lead weathering to high level ledge. Including Introduce lead weathering to portland stone window bays. Installation of hand rails to main entrance. Including removal of non-original vent enclosure.
Awaiting decision Full applications Windows or glazing 10 docs -
York Bridge London NW1 4NS
89% historically approved · decision due ~9 Mar
Details of new and repaired brickwork, and the selection and profile of new stonework to match existing; method statement (partial discharge) pursuant to conditions 3, 4, 5 and 6 of listed building consent dated 5th March 2023 (RN: 22/07364/LBC).
Awaiting decision Conditions 3 docs -
Regent's University London Inner Circle Regent's Park London NW1 4NS
89% historically approved · decision due ~9 Oct
1 x dead cherry and 2 x dead birch: fell.
Awaiting decision -
Regent's University London Inner Circle Regent's Park London NW1 4NS
90% historically approved · decision due ~14 Sep
Internal bathroom refurbishment at ground to third floor level.
Decided Heritage and listed buildings 15 docs -
Regent's University London Inner Circle Regents Park London NW1 4NS
2 x cherry (T1&T2): Fell
Granted Trees 7 docs -
Regent's University London Inner Circle Regent's Park London NW1 4NS
T1 1 x weeping ash: fell
Granted Trees 7 docs
Other heritage and listed building applications
In Westminster
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)
-
26/07461/LBC Awaiting decision
1 Savile Row London W1S 3JR
Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.