Skip to content
PlanIndex Get alerts
Menu

Planning application

25/06051/FULL

73 Alderney Street London SW1V 4HH

Granted Westminster Full Planning Permission Application

Proposal

Replacement of first floor railings with traditional concrete balustrade, replacement of front door and existing porch glazing, and replacement of front door at 73a.

As published by the council, reference 25/06051/FULL

Timeline

Dates from the published record

  1. 25 Aug 2025

    Received by Westminster

  2. 18 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 30 Oct 2025

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/06404/FULL Granted

    88 Cambridge Street London SW1V 4QG

    Reinstatement of windows to the ground, first and second floor levels on the Clarendon Street elevation.

    8 Sep 2025 26m away Full applications
  • 25/09032/ADFULL Granted

    88 Cambridge Street London SW1V 4QG

    Details of the new windows on the Clarendon Street elevation to match the existing adjacent windows pursuant to condition 4 (a) of planning permission dated 13th November 2025 (RN: 25/06404/FULL)

    12 Dec 2025 47m away Full applications
  • 26/02872/NMA Awaiting decision

    106G Cambridge Street London SW1V 4QG

    Amendments to planning permission dated 12th September 2025 (RN:25/05397/FULL) for: Installation of replacement double glazed windows at fourth floor level namely to change colour of approved aluminium window frames from white to grey/anthracite.

    30 Apr 2026 47m away Amendments
  • 25/09341/TPO Granted

    65 Winchester Street London SW1V 4NU

    1 x sycamore (T1): crown reduce by approx. 2-3m; to previous most recent reduction points.

    24 Dec 2025 57m away Trees
  • 25/06878/TCA Granted

    89 Cambridge Street London SW1V 4PY

    1 x Ginko: crown lift by 0.5m, reduce lower lateral branches to ensure clearance from property and adjacent tree and to allow light into garden and neighbours garden. Reduce crown height by 5m and lightly reduce overlong branches by upto 1m as required to shape and balance.

    24 Sep 2025 58m away Trees
  • 25/06210/CLEUD Awaiting decision

    64 Cambridge Street London SW1V 4QQ

    Lawful Development Certificate (LDC) for the continued use of the upper floors as a ground floor flat and a first and second floor maisonette.

    2 Sep 2025 61m away Lawful development

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications