Planning application
25/05908/ADFULL
25 Taunton Place London NW1 6HB
Proposal
Details of how waste is to be stored on site and how materials for recycling will be stored separately pursuant to condition 3 of planning permission dated 28th May 2025 (RN:25/01154/FULL).
As published by the council, reference 25/05908/ADFULL
Timeline
Dates from the published record
-
20 Aug 2025
Received by Westminster
-
29 Aug 2025
Validated
Checked as complete and ready for consideration.
-
3 Oct 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05652/ADFULL Granted
25 Taunton Place London NW1 6HB
Details of bay windows, windows, doors, window louvres, new facing materials, canopies to rear terrace entrances on south elevation and louvre within the main roof pitch (west elevation) pursuant to Condition 14 (I, ii, iii, iv, v, vi and vii) of planning permission dated 28 May 2025 (RN25/01154/FULL)
-
26/00122/ADFULL Granted
25 Taunton Place London NW1 6HB
Details of a management plan pursuant to condition 6 of planning permission dated 28th May 2025 (RN: 25/01154/FULL).
-
26/00962/NMA Granted
25 Taunton Place London NW1 6HB
Amendments to planning permission dated 28th May 2025 (RN: 25/01154/FULL) for Alterations to the facades including new windows and doors, the removal and installation of additional louvres, installation of plant equipment and housing at roof level, alterations to rear entrances and canopy's. Namely, to revise the wording of the original development consent
-
26/00356/LBC Awaiting decision
67 Balcombe Street London NW1 6HD
Conversion of existing under pavement vaults to create new bathroom, store and service room with link at lower ground level between house and vaults under entrance step. (Linked to 26/00355/FULL)
-
25/08861/LBC Granted
67 Balcombe Street London NW1 6HD
Internal refurbishment to complete works approved in previous listed building consent, rectification of heating, replacement of water damaged internal finishes, install doors in existing frames, amendments to room layouts and internal openings with new doors, new kitchen and bathrooms, removal of dropped ceilings and cornices, with replacement plaster cornices and new lighting.
-
26/00355/FULL Awaiting decision
67 Balcombe Street London NW1 6HD
Conversion of existing under pavement vaults to create new bathroom, store and service room with link at lower ground level between house and vaults under entrance step. (Linked to 26/00356/LBC)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.