Planning application
25/05880/FULL
7A Langley Street London WC2H 9JA
Proposal
Installation of service pipes and duct work, plant and associated step overs.
As published by the council, reference 25/05880/FULL
Timeline
Dates from the published record
-
19 Aug 2025
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/07474/ADFULL Awaiting decision
7A Langley Street London WC2H 9JA
Details of a material sample of the metalwork gate pursuant to condition 4 of planning permission dated 30th May 2025 (RN:25/02630/FULL) (Linked to 25/07498/ADLBC)
-
26/02410/ADV Awaiting decision
6 Langley Street London WC2H 9JA
Display of one externally illuminated projecting sign measuring 0.77m x 0.77m. Linked with 26/02411/LBC
-
26/02411/LBC Awaiting decision
6 Langley Street London WC2H 9JA
Installation of awning; signage and other associated works. Linked with 26/02410/ADV
-
25/06010/NMA Granted
28 - 32 Shelton Street London WC2H 9JE
Amendments to planning permission dated 31 May 2023 (RN: 22/02009/FULL) for Mixed-use development at Old Brewer's Yard including: at 28-32 Shelton Street, the erection of a single storey roof extension, a rooftop plant enclosure and other external alterations (including shopfront alterations, new rear access to the Yard, and plant) in connection with the use of the building as a restaurant (Class E(b)); at 1 Mercer Walk, the installation of ancillary plant & servicing equipment, external alterations including opening up of blind windows on east elevation and the installation of PV panels at main roof level, all in connection with the use of the building as a microbrewery and visitor attraction with ancillary retail, bar and training space (Sui Generis); at 15A Neal Street (ground floor only), external alterations including installation of full-height glazed rear wall and installation of a new shopfront; at 5 Langley Street (basement, part-ground floor and part-roof only) alterations to north and west facade and installation of new plant, all in connection with the flexible mixed-use of the basement and part-ground floor as entertainment/events/community space with ancillary storage areas (Sui Generis); at the rear of 7 Langley Street, installation of plant at roof level and the use of the former bin store as a bar area servicing the Yard (Sui Generis); at Old Brewer's Yard, the erection of a new high-level glazed canopy structure and semi-permanent external seating, installation of new entrance gates fronting Shelton Street, placement of planters and associated street furniture, for use of the Yard as a flexible entertainment/dining/events/ community outdoor space (Sui Generis). (Site includes Old Brewer's Yard, 28-32 Shelton Street, 15A Neal Street, 5 and 7 Langley Street, 1 and 3 Mercers Walk and 107-115 Long Acre). Namely, to replace existing double access doors at 5 Langley Street secondary entrance with new inset double doors.
-
25/05254/ADV Withdrawn
28 - 32 Shelton Street London WC2H 9JE
Display of illuminated clock feature (2500mm width), faux neon harp sign, suspended chain link banners within tunnels, brick-wrap vinyl treatments, and reflective mirror installation forming part of the Guinness Open Gate Brewery wayfinding scheme. (Site include Old Brewer's Yard, 28-32 Shelton Street, 15a Neal sStreet, 5 and 7 Langley Street, 1 and 3 Mercers Walk and 107-115 Long Acre).
-
25/06439/FULL Awaiting decision
28 - 32 Shelton Street London WC2H 9JE
Installation of eight screen-printed mirrors/panels as public art on Mercers Walk East facade and two large-scale artist murals on Old Brewer's Yard courtyard north and west elevations, applied over clear vinyl wrap to brickwork, celebrating local brewing heritage and the 'Goods In, Goods Out' narrative.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.