Planning application
25/05666/FULL
Chelwood House Gloucester Square London W2 2SY
Proposal
Replacement of door and windows with installation of new doors to existing terrace to flat at third floor level (Flat 31).
As published by the council, reference 25/05666/FULL
Timeline
Dates from the published record
-
12 Aug 2025
Received by Westminster
-
29 Sep 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
06/00376/LBC Granted
Radnor Court Radnor Place London W2 2TE
Addition of mansard roof.
-
06/00190/FULL Granted
Radnor Court Radnor Place London W2 2TE
Renewal of planning permission dated 09 February 2001 (RN: 00/08627) namely, creation of mansard roof at Flat 4.
-
03/06167/FULL Granted
6 Radnor Place London W2 2TE
Installation of new metal security gate to entrance of basement car park from Radnor Mews
-
25/09315/FULL Granted
Chelwood House Gloucester Square London W2 2SY
Replacement of front and rear windows to flats 7 & 8 including balcony doors.
-
03/05290/FULL Refused
Flats 1 - 21 Alleyn Court 123 Sussex Gardens London W2 2RZ
Replacement of cold water storage tank and rebuilding of tank enclosure-height of tank enclosure to increase by 500mm, materials to match existing.
-
11/12208/FULL Refused
Alleyn Court 123 Sussex Gardens London W2 2RZ
Internal alterations to lower ground floor to provide for an additional three residential units making four in total, and alterations to windows; lower ground front elevation and at rear change garage doors. Partial enclosure of front lightwell and relocation of access stairs.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.