Planning application
25/05587/FULL
24 Hamilton Terrace London NW8 9UG
Proposal
Extension of rear lightwell; alteration to front garden including to steps and front boundary; install balustrade to front windows; introduction of french doors to the rear ground floor level; alterations to second floor flat roof including rooflights, railings and steps in association with use as a terrace; and layout changes to all floors. (Linked with 25/05588/LBC)
As published by the council, reference 25/05587/FULL
Timeline
Dates from the published record
-
11 Aug 2025
Received by Westminster
-
15 Aug 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05602/LBC Granted
24 Hamilton Terrace London NW8 9UG
Replacement of single-glazing with vacuum glazing.
-
25/05588/LBC Awaiting decision
24 Hamilton Terrace London NW8 9UG
Extension of rear lightwell; alteration to front garden including to steps and front boundary; install balustrade to front windows; introduction of French doors to the rear ground floor level; alterations to second floor flat roof including rooflights, railings and steps in association with use as a terrace; and layout changes to all floors. (Linked with 25/05587/FULL)
-
25/06345/LBC Granted
24 Hamilton Terrace London NW8 9UG
Restructuring part of the boundary wall between 24 and 26 Hamilton Terrace, dismantling existing boundary wall, building new supporting structure to allow for root growth and rebuilding boundary wall using existing bricks. (Linked to 25/06344/FULL)
-
25/06344/FULL Granted
24 Hamilton Terrace London NW8 9UG
Rebuilding part of the boundary wall between 24 and 26 Hamilton Terrace, dismantling existing boundary wall, building new supporting structure to allow for root growth and rebuilding boundary wall using existing bricks. (Linked to 25/06345/LBC)
-
25/08694/TPO Granted
26 Hamilton Terrace London NW8 9UG
1 x Ash (T1, rear): Crown thin regrowth on previous reduction points by 30%; ensuring retention of strong regrowth to develop a balanced and well structured crown.
-
25/07829/ADLBC Awaiting decision
2D Hamilton Terrace London NW8 9UG
Details of Photographic schedule of the door parts, with their architraves and linings and Methodology of reassembly pursuant to discharge of condition 3 (i and ii) of listed building consent dated 17th October 2025 (25/02784/LBC).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.