Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 3 68 Eccleston Square London SW1V 1PJ

Granted Westminster 25/05549/LBC Listed Building Consent Application

Works: Windows or glazing

Relates to 25/05548/FULL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal alterations and refurbishment including replacement of modern French doors and windows with slimline, double-glazed timber and other associated works. Linked with 25/05548/FULL

As published by the council, reference 25/05549/LBC

Application record

Reference
25/05549/LBC
Type
Listed Building Consent Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
8 Aug 2025
Validated
25 Aug 2025
Decided
15 Oct 2025
Ward
Pimlico North
Decision by
Delegated Decision
Postcode
SW1V 1PJ

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2025: 4 approved, 0 refused.

  • 25/08705/ADFULL Granted

    Flat 3 68 Eccleston Square London SW1V 1PJ

    Details of new window to rear pursuant to condition 4 of planning permission dated 15 October 2025 (RN: 25/05548/FULL) [Linked to 26/01299/ADLBC]

    Decided 9 Mar 2026 Full applications
  • 26/01299/ADLBC Granted

    Flat 3 68 Eccleston Square London SW1V 1PJ

    Details of new cornices, chimneypieces, skirtings, internal doors and window to rear; and retention of non-original cornices pursuant to conditions 4 and 5 of listed building consent dated 15 October 2025 (RN: 25/05549/LBC)

    Decided 9 Mar 2026 Conditions
  • 25/05548/FULL Granted

    Flat 3 68 Eccleston Square London SW1V 1PJ

    Replacement of modern French doors and windows with slimline, double-glazed timber units and other associated works.

    Decided 9 Oct 2025 Full applications

Timeline

Dates from the published record

  1. 8 Aug 2025

    Received by Westminster

  2. 25 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 15 Oct 2025

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 25/05548/FULL Granted

    Flat 3 68 Eccleston Square London SW1V 1PJ

    Replacement of modern French doors and windows with slimline, double-glazed timber units and other associated works.

    Decided 9 Oct 2025 Full applications

1 later application on the register refers to this one:

  • 26/01299/ADLBC Granted

    Flat 3 68 Eccleston Square London SW1V 1PJ

    Details of new cornices, chimneypieces, skirtings, internal doors and window to rear; and retention of non-original cornices pursuant to conditions 4 and 5 of listed building consent dated 15 October 2025 (RN: 25/05549/LBC)

    Decided 9 Mar 2026 Conditions

Who's behind it

Company information only, from the register and Companies House

Kinsonov Architects Agent, an architecture practice

8 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 15 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Flat 3 68 Eccleston Square London SW1V 1PJ

    25/05548/FULL Submitted 8 Aug 2025 50 yards away

    Replacement of modern French doors and windows with slimline, double-glazed timber units and other associated works.

    Granted Full applications Windows or glazing 25 docs
  • 68 Eccleston Square London SW1V 1PJ

    26/00458/FULL Submitted 27 Jan 2026 50 yards away

    88% historically approved · decision due ~29 May

    Installation of one air source heat pump within rear lightwell [Flat 2].

    Awaiting decision Full applications 20 docs
  • Fourth Floor 70 Eccleston Square London SW1V 1PJ

    25/07284/FULL Submitted 8 Oct 2025 50 yards away

    Alterations to roof and loft area to create habitable floor level including additional bedroom and ancillary space.

    Refused Full applications 19 docs
  • Fourth Floor 70 Eccleston Square London SW1V 1PJ

    25/07285/LBC Submitted 8 Oct 2025 50 yards away

    Alterations to roof and loft area to create habitable floor level including additional bedroom and ancillary space.

    Refused Heritage and listed buildings 14 docs
  • 70 Eccleston Square London SW1V 1PJ

    25/06631/LBC Submitted 16 Sep 2025 50 yards away

    Removal of flat infill roof and reinstatement of inner roof pitches including new roof coverings.

    Granted Heritage and listed buildings Extension Roofing 22 docs
  • 68 Eccleston Square London SW1V 1PJ

    26/02262/LBC Submitted 3 Apr 2026 50 yards away

    90% historically approved · decision due ~29 May

    Installation of one air source heat pump within existing external lightwell to existing residential property. (Linked to 26/00458/FULL)

    Awaiting decision Heritage and listed buildings 15 docs

In Westminster

  • 26/07529/LBC Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)

    Received 5 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07509/LBC Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)

    Received 4 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07473/LBC Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)

    Received 3 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07471/LBC Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07461/LBC Awaiting decision

    1 Savile Row London W1S 3JR

    Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings