Planning application
Flat 2 284 Elgin Avenue London W9 1JR
Works: Loft or dormer Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of two dormer windows and installation of one skylight.
As published by the council, reference 25/05516/FULL
Application record
- Reference
- 25/05516/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 6 Aug 2025
- Validated
- 7 Oct 2025
- Decided
- 18 Mar 2026
- Ward
- Maida Vale
- Decision by
- Delegated Decision
- Postcode
- W9 1JR
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
26/02781/ADFULL Awaiting decision
Flat 2 284 Elgin Avenue London W9 1JR
Details of dormer construction, lead detailing and timber sash window pursuant to condition 4 of planning permission dated 18th March 2026 (RN: 25/05516/FULL).
Timeline
Dates from the published record
-
6 Aug 2025
Received by Westminster
-
7 Oct 2025
Validated
Checked as complete and ready for consideration.
-
18 Mar 2026
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Kalkwarf Architects Agent, an architecture practice
3 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 18 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
282 Elgin Avenue London W9 1JR
Replacement of the existing two storey outrigger at lower ground and ground floors with incorporation of a Juliet balcony, rear staircase and balcony and alteration to fenestration
Granted Full applications Extension Windows or glazing 22 docs -
-
Basement 278 Elgin Avenue London W9 1JR
88% historically approved · decision due ~23 Apr
Erection of single storey rear extension, installation of a new window to front lightwell and associated works.
Awaiting decision Full applications Extension Windows or glazing 29 docsSmall domestic -
Flat 2 284 Elgin Avenue London W9 1JR
88% historically approved · decision due ~22 Jun
Details of dormer construction, lead detailing and timber sash window pursuant to condition 4 of planning permission dated 18th March 2026 (RN: 25/05516/FULL).
Awaiting decision Full applications Loft or dormer Windows or glazing 4 docs -
Flat 1 280 Elgin Avenue London W9 1JR
88% historically approved · decision due ~29 Oct
Erection of Garden Room in rear garden of Lower Ground Floor Flat.
Decided Full applications -
139 Randolph Avenue London W9 1DN
Installation of an air condenser unit within an acoustic enclosure to the rear garden.
Granted Full applications 19 docs
Other full applications
In Westminster
-
26/06015/FULL Decided
129 Saltram Crescent London W9 3JT
Erection of a two-storey rear extension.
-
26/05689/FULL Decided
Flat 1 12 Bristol Gardens London W9 2JG
Demolition of an existing conservatory at the rear at lower ground level and erection of single storey rear extension.
-
26/07361/FULL Awaiting decision
29 Alexander Street London W2 5NU
Change of the existing ground and lower ground floors from Use Class E(g)(i) (Commercial business and service) to Class C3 dwelling with the creation of a two-bedroom maisonette with associated external alterations.
-
26/07360/FULL Awaiting decision
11 Marylebone Mews London W1G 8PX
Variation of condition 1 of planning permission dated 02 July 2026 (RN 26/00802/FULL) for the Erection of a mansard roof extension, excavation and extension of the existing basement, installation of plant within a louvered acoustic enclosure on the rear flat roof at second floor and the replacement of the fenestration to the front and rear of the building; all to enlarge and alter dwellinghouse (Class C3). NAMELY, amendments to layout in bedroom at the front of the floor plan where it would benefit from two of the windows that overlook the Mews, with the bathroom at the back of the mid-section of the floor plan with access to one of the wardrobe spaces.
-
26/07340/FULL Awaiting decision
123 Victoria Street London SW1E 6DE
Installation of a single-leaf glazed entrance door at ground level to the Victoria Street frontage