Skip to content
PlanIndex Get alerts
Menu

Planning application

Basement And Ground Floor 112 - 114 Wardour Street London W1F 0TS

Granted Westminster 25/05457/FULL Full Planning Permission Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alteration to the approved left-sided shopfront window; alteration being to the glazing and framing design; Retention of the existing entrance door to right side of shopfront; Retention of existing wider shopfront.

As published by the council, reference 25/05457/FULL

Application record

Reference
25/05457/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
4 Aug 2025
Validated
18 Aug 2025
Decided
3 Oct 2025
Ward
West End
Decision by
Complex Delegated Decision
Postcode
W1F 0TS

Timeline

Dates from the published record

  1. 4 Aug 2025

    Received by Westminster

  2. 18 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 3 Oct 2025

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Planning Potential Ltd. Agent, a planning consultancy registered in London

Active · incorporated 2005 · London

934 applications on PlanIndex · across 150 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 3 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 118 - 120 Wardour Street London W1F 0TU

    03/07296/AD7 Submitted 19 Sep 2003 50 yards away

    Display for a temporary period of six months of a non-illuminated 'to let'/ 'for sale'* board located on the face of the building at a height of between 3m and 4.6m above pavement level and measuring 1.2m x 0.9m.

    Granted Advertising 2 docs
  • 118 - 120 Wardour Street London W1F 0TU

    05/02952/ADV Submitted 15 Apr 2005 50 yards away

    Display of externally illuminated fascia sign.

    Granted Advertising 4 docs
  • 118 - 120 Wardour Street London W1F 0TU

    05/01239/ADV Submitted 16 Feb 2005 50 yards away

    Display of externally illuminated fascia sign and retractable awning.

    Refused Advertising 4 docs
  • 135 - 139 Wardour Street London W1F 0UT

    25/08702/ADV Submitted 28 Nov 2025 50 yards away

    Display of two internally illuminated projecting sign measuring 0.5m x 0.5m.

    Refused Advertising 9 docs
  • 141 Wardour Street London W1F 0UT

    22/03130/FULL Submitted 10 May 2022 50 yards away

    Replacement of windows, facade cleaning, replacement of reception entrance doors, installation of extract grilles on the western facade, installation of doors to refuse and cycle stores at ground floor of the western facade, creation of accessible terraces to the western side of the 4-6th floors, erection of lift enclosure and lobby at roof level and creation of accessible rooftop terrace, consolidation of rooftop plant and installation of photovoltaic panels.

    Granted Full applications Windows or glazing 60 docs
  • 124 - 126 Wardour Street London W1F 0TY

    26/05816/CLOPUD Submitted 25 Aug 2026 50 yards away

    84% historically approved · decision due ~23 Oct

    Use of three existing HMOs (flats 1, 2 and 4) [Class C4] as three, self-contained Class C3 flats.

    Decided Lawful development New dwelling

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications