Planning application

134 - 136 Seymour Place London W1H 1NT

Granted Westminster 25/05437/CLEUD Certificate of Lawfulness (existing)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Confirmation that the current use of the building falls within Class E of the Town and Country Planning (Use Classes) Order 1987 (as amended) is lawful.

As published by the council, reference 25/05437/CLEUD

Application record

Reference
25/05437/CLEUD
Type
Certificate of Lawfulness (existing)
Status
Decided
Decision
Granted As published: Application Permitted
Received
4 Aug 2025
Validated
4 Aug 2025
Decided
21 Oct 2025
Ward
Marylebone
Decision by
Delegated Decision
Postcode
W1H 1NT

Timeline

Dates from the published record

  1. 4 Aug 2025

    Received by Westminster

  2. 21 Oct 2025

    Decision issued: Application Permitted

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Kore Planning Agent, a planning consultancy registered in London

Active · incorporated 2025 · London

2 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 21 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 132 Seymour Place London W1H 1NS

    25/05662/FULL Submitted 12 Aug 2025 10m away

    Demolition of existing first floor rear extension and construction of a proposed full width first floor and part width second to third floor rear extension with rear second floor roof terrace, to extend existing flats (ClassC3).

    Granted Full applications New dwelling Extension +1 30 docs
  • St Mary's C Of E Primary School Enford Street London W1H 1DL

    26/01719/FULL Submitted 17 Mar 2026 38m away

    87% historically approved · decision due ~12 May

    Installation of an external exit gate onto Walmer Place / Virgil Place and erection of a single storey timber building in the playground.

    Awaiting decision Full applications 14 docs
    Small domestic
  • 1 The Court House 165 Seymour Place London W1H 4PU

    26/05200/FULL Submitted 3 Aug 2026 39m away

    87% historically approved · decision due ~21 Oct

    Installation of waterproofing system to the existing lead flat roofs

    Awaiting decision Full applications
  • St Mary's C Of E Primary School Enford Street London W1H 1DL

    26/02978/TCA Submitted 6 May 2026 40m away

    100% historically approved · decision due ~1 Jul

    T1 - Magnolia grandiflora - Remove to ground level. Tree is very close to the building and is covering solar panels on the roof. T2 - Tree of heaven - reduce back to previous pruning points and remove basal growth to maintain size and reduce wind sail. From approx 14 metres to 10 metres. T3 - Tree of heaven - reduce back to previous pruning points and remove basal growth to maintain size and reduce wind sail. From approx 14 metres to 10 metres. T4 - olive tree - cut back from building to provide clearance and reduce shade on solar panels from approx 6 metres to 4 metres. T5 - Acer - reduce back to previous pruning points to maintain size and reduce wind sail. From approx 12 metres to 9 metres. T6 - Acer - reduce back to previous pruning points to maintain size and reduce wind sail. From approx 12 metres to 9 metres.

    Awaiting decision Trees 6 docs
  • 116 Seymour Place London W1H 1NW

    04/05783/AD7 Submitted 23 Jul 2004 59m away

    Display for a temporary period of six months of a non-illuminated 'to let' board located on the face of the building at a height of between 3m and 4.6m above pavement level and measuring 0.6m x 0.9m.

    Granted Advertising 2 docs
  • 116 Seymour Place London W1H 1NW

    05/07604/FULL Submitted 16 Sep 2005 59m away

    Installation of new shopfront.

    Withdrawn Full applications Windows or glazing 4 docs

In Westminster

  • 26/06158/CLOPUD Awaiting decision

    2 Hamilton Gardens London NW8 9PT

    Erection of replacement, enlarged single storey ground floor rear extension.

    Received 9 Sep, published by the council 15 Sep 2026 Lawful development
  • 26/06080/CLEUD Awaiting decision

    91 Gloucester Place London W1U 6JG

    Certificate of lawfulness for an existing use or development to confirm that the development authorised by full planning permission ref. 22/08385/FULL & listed building consent (RN 22/08386/LBC) has lawfully commenced as a result of the works evidenced.

    Received 7 Sep, published by the council 14 Sep 2026 Lawful development
  • 26/06044/CLOPUD Awaiting decision

    9 Abinger Mews W9 3SP

    Proposed loft conversion with rear dormer and 3 front rooflights to existing mid-terraced house.

    Received 3 Sep, published by the council 11 Sep 2026 Lawful development
  • 26/06035/CLOPUD Awaiting decision

    30 Ashworth Road W9 1JY

    Erection of new garden retaining wall and erection of new garden timber fence to match the height of existing fence.

    Received 3 Sep, published by the council 11 Sep 2026 Lawful development
  • 26/05871/CLEUD Awaiting decision

    32 Cambridge Street London SW1V 4QH

    Confirmation of the lawful implementation of planning permission dated 13 August 2021 (RN: 21/04143/FULL) has commenced before the expiry of the three year time period and may, therefore, lawfully be carried out and completed.

    Received 27 Aug, published by the council 4 Sep 2026 Lawful development