Planning application
25/05403/ADFULL
5 Strand London WC2N 5HR
Proposal
Details of whole life carbon assessment pursuant to condition 35 (part b) of planning permission dated 24 September 2024 (RN: 23/05178/FULL).
As published by the council, reference 25/05403/ADFULL
Timeline
Dates from the published record
-
1 Aug 2025
Received by Westminster
-
3 Sep 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/07200/ADFULL Awaiting decision
5 Strand London WC2N 5HR
Details of Construction Logistics Plan pursuant to Condition 28 of planning permission dated 24 September 2024 (RN 23/05178/FULL)
-
25/07201/ADFULL Awaiting decision
5 Strand London WC2N 5HR
Details of steps taken to achieve secured by design accreditation pursuant to condition 37 of planning permssion dated 24th September 2024 (RN 23/05178/FULL)
-
21/08610/FULL Refused
11 Strand London WC2N 5HR
Development comprising infilling at ground floor (undercroft) level to Strand and Charing Cross frontages to create additional retail floorspace (Use Class E(a))
-
26/01969/ADFULL Awaiting decision
5 Strand London WC2N 5HR
Details of Code of Construction Practice pursuant to Condition 3 of planning permission dated 24/09/2024 (RN: 23/05178/FULL)
-
25/08410/ADFULL Awaiting decision
11 Strand London WC2N 5HR
Details of premises management plan, the acoustic housing detail plan and servicing managment plan pursuant to conditions 3,4 and 5 of planning permission dated 11th April 2024 (RN:23/02207/FULL)
-
26/01434/FULL Awaiting decision
Grand Buildings 1 - 3 Strand London WC2N 5HE
Use of Tower 03 at 7th and 8th floor level as a residential maisonette (Class C3) and use of Tower 04 at 7th and 8th floor level as offices (Class E).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.