Planning application
25/05259/FULL
The Lister Hospital Chelsea Bridge Road London SW1W 8RH
Proposal
Extension of the existing roof top plant room and installation of an extended louvred facade. (Linked with 25/05260/LBC)
As published by the council, reference 25/05259/FULL
Timeline
Dates from the published record
-
28 Jul 2025
Received by Westminster
-
22 Sep 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05260/LBC Granted
The Lister Hospital Chelsea Bridge Road London SW1W 8RH
Extension of the existing roof top plant room, installation of an extended louvred facade, and installation of new plant internally. (Linked with 25/05259/FULL)
-
26/04296/ADV Awaiting decision
Bus Stop Outside Lister Hospital Chelsea Bridge Road London
Display of an internally illuminated double sided bus-stop digital advertisement screen measuring 2.1m x 1.34m.
-
TTT/25/00076 Awaiting decision
Thames Tideway new foreshore site near the Royal Hospital and Ranelagh Gardens, Chelsea Embankment Foreshore, Chelsea Embankment, London, SW3 4LW
Application for the Site Specific Contaminated Land Verification Report at the Thames Tideway Chelsea Embankment Foreshore (CHEEF) worksite under Schedule 3 requirement CHEEF10 part 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) (the Order), and in accordance with the procedure set out by Schedule 17 of the Order - Verification Report on Site specific Contaminated Land (partial discharge)
-
26/03277/FULL Awaiting decision
53 Westmoreland Terrace London SW1V 4AQ
Domestic refurbishment, incorporating: a ground floor infill extension with a large sliding window at the rear of the property; an enlarged amenity terrace with rooflight, behind a raised parapet at first floor level; a new single-storey mansard roof extension accessed via a vertically extended closet wing; double-glazing to existing and proposed windows; new French doors and stairs and the removal of the existing basement door within front elevation lightwell.
-
25/05745/FULL Awaiting decision
55 Westmoreland Terrace London SW1V 4AQ
Mansard roof extension.
-
26/00678/COGADF Granted
Ebury Bridge Estate Ebury Bridge Road London SW1W 8PX
Details of a construction logistics plan for the Phase 2 earthwork, piling phase and construction phase, pursuant to condition 8 of planning permission dated 21st July 2023 (RN:23/00331/COOUT)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.