Planning application
London Coliseum 32 - 35 St Martin's Lane London WC2N 4ES
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Install new fall protection railings and replace roof coverings and battens to match existing at roofs 7 and 11, and replace sanitaryware and other fittings inside male toilets at upper circle (level 05) and balcony (level 07) levels.
As published by the council, reference 25/05219/LBC
Application record
- Reference
- 25/05219/LBC
- Type
- Listed Building Consent Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 25 Jul 2025
- Validated
- 5 Aug 2025
- Decided
- 18 Sep 2025
- Ward
- St James's
- Decision by
- Delegated Decision
- Postcode
- WC2N 4ES
Timeline
Dates from the published record
-
25 Jul 2025
Received by Westminster
-
5 Aug 2025
Validated
Checked as complete and ready for consideration.
-
18 Sep 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Metashape Limited Agent, registered in London
Dissolved · incorporated 2019 · London
10 applications on PlanIndex · across 5 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
88 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 18 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
36 St Martin's Lane London WC2N 4ER
89% historically approved · decision due ~17 Aug
Details of repairs to the plinth and column bases at the timber cupola and details of any temporary support pursuant to condition 4 (b) of listed building consent dated 22 August 2024 (RN: 23/07356/LBC).
Awaiting decision Conditions 1 doc -
42 - 49 St Martin's Lane London WC2N 4EJ
88% historically approved · decision due ~1 Dec
Installation of new shopfront.
Awaiting decision Full applications Windows or glazing -
42 - 49 St Martin's Lane London WC2N 4EJ
82% historically approved · decision due ~1 Dec
Display of internally illuminated fascia sign measuring 7.8m X 1.6m and two internally illuminated other signs 0.85m x 1.5m to St Martins Lane entrance and glazed openings for digital signage
Awaiting decision Advertising Windows or glazing -
45 St Martin's Lane London WC2N 4HX
88% historically approved · decision due ~11 Aug
Variation of Condition 5 of planning permission dated 09 July 2024 (RN: 24/02008/FULL) for use of two areas of the public highway measuring 3.2m x 13.3 and 3.2m x 21.4m for the placing of 22 tables, 33 chairs and five wooden benches, three freestanding electric heaters and planters namely to extend the period for the placing of the tables and chairs and associated furniture for a further temporary period of two years.
Decided Full applications -
42 - 49 St Martin's Lane London WC2N 4EJ
89% historically approved · decision due ~18 Nov
Details of an operational management plan pursuant to condition 8 of planning permission dated 29 July 2026 (RN:25/07802/FULL).
Decided -
42 - 49 St Martin's Lane London WC2N 4EJ
89% historically approved · decision due ~17 Nov
Details of the kitchen air recirculation system (or alternative ventilation system) to get rid of cooking smells, including details of how it will be built and how it will look; and a post commissioning report showing it has been installed in accordance with the design submitted (under condition 15) pursuant to Conditions 15 and 16 of planning permission dated 29 July 2026 (RN:25/07802/FULL).
Awaiting decision
Other heritage and listed building applications
In Westminster
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07442/LBC Awaiting decision
2 Charing Cross Road London WC2H 0HH
Installation of festoon lights to the front elevation from top of existing columns to canopy fascia level including installation of perimeter lightbox to main top sign and proposed coloured light to columns.
-
26/05053/LBC Decided
23 York Street London W1U 6PF
Installation of 6 condenser units at main roof level, new windows and doors and internal reconfiguration and refurbishment of the existing residential building to improve the layout of six self-contained flats, together with associated internal alterations, minor external alterations to the rear elevation. (Linked with 26/05052/FULL)
-
26/07452/LBC Awaiting decision
Flat 1 31 South Audley Street London W1K 2PG
Replacement of windows, Installation of an external condenser to the rear elevation including Internal refurbishment. (Linked with 26/07451/FULL)
-
26/07433/LBC Awaiting decision
9 Henrietta Street London WC2E 8PW
Refurbishments to the ground floor entrance, alterations to the rear third floor terrace including installation of external handrail and removal of existing condensers and installation of new plant equipment at first floor level. Internal alterations at ground floor entrance and upper floors and other associated works. (Linked with 26/07432/FULL)