Planning application
96 Queensway London W2 3RR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of a supplementary acoustic report pursuant to condition 6 of planning permission dated 18th December 2024 (RN:24/07460/FULL)
As published by the council, reference 25/05213/ADFULL
Application record
- Reference
- 25/05213/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 25 Jul 2025
- Validated
- 25 Jul 2025
- Decided
- 28 Aug 2025
- Ward
- Lancaster Gate
- Decision by
- Delegated Decision
- Postcode
- W2 3RR
Site history
Applications at this address on the Westminster register
This site has had 4 applications since 2025: 2 approved, 0 refused.
-
26/04249/FULL Awaiting decision
96 Queensway London W2 3RR
Installation of mechanical plant at rear first floor roof level and full height ventilation ducting, associated with restaurant (Retrospective)
-
25/08974/FULL Awaiting decision
96 Queensway London W2 3RR
Retrospective application for restaurant mechanical plant equipment at rear first floor roof level.
-
25/07462/FULL Granted
96 Queensway London W2 3RR
Installation of external ground floor tiling. (Site includes 96 & 98 Queensway).
Timeline
Dates from the published record
-
25 Jul 2025
Received by Westminster
-
28 Aug 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Firstplan Ltd Agent, registered in London
Active · incorporated 2003 · London
743 applications on PlanIndex · across 109 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 28 August 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
90 Queensway London W2 3RR
87% historically approved · decision due ~16 Sep
Detailed drawings showing the rear windows and doors to reflect existing glazing pattern of original windows, detailed drawings of the brickwork sample panel to show brick type, bond and pointing, joinery sections through timber windows and doors, joinery sections through shopfront, rear railing design and method fixing behind parapet and details of writing appropriate arrangements to secure measures to mitigate the potential increased demand for on-street residents car parking in the vicinity of the site pursuant to condition 3, 4 and 9 of planning permission dated 26th June 2025 (RN:24/08144/FULL)
Awaiting decision Full applications Windows or glazing 13 docs -
86 Queensway London W2 3RR
84% historically approved · decision due ~5 May
Display of an internally illuminated fascia sign measuring 0.6m X 0.6m, non illuminated other sign measuring 2.86m X 2.4m and non illumunated fascia sign 2.86m X 8.7m
Awaiting decision Advertising 11 docs -
106 Queensway London W2 3RR
84% historically approved · decision due ~5 Oct
Display of externally illuminated fascia and projecting signs measuring 1.10m x 4.50m and 0.80m x 0.80m. (Linked with 26/04086/FULL)
Decided Advertising -
106 Queensway London W2 3RR
87% historically approved · decision due ~5 Oct
Replacement shopfront and external ramp. (Linked with 26/04087/ADV)
Awaiting decision Full applications Windows or glazing -
96 Queensway London W2 3RR
87% historically approved · decision due ~21 Aug
Installation of mechanical plant at rear first floor roof level and full height ventilation ducting, associated with restaurant (Retrospective)
Awaiting decision Full applications -
96 Queensway London W2 3RR
87% historically approved · decision due ~4 Feb
Retrospective application for restaurant mechanical plant equipment at rear first floor roof level.
Awaiting decision Full applications 16 docs
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising repolacement window and installation of double opening door.
-
26/06287/FULL Awaiting decision
Barness Court 6 - 8 Westbourne Terrace London W2 3UW
Installation of a new riser as per GW10 design comprising a single riser with 7 entries and 9 Taylor valves to be installed. (Linked with 26/06288/LBC)
-
26/06278/FULL Awaiting decision
40 Wellington Road London NW8 9TJ
Installation of a new external access ramp/slope to provide accessibility to the Barclays bank ATM.
-
26/06269/FULL Awaiting decision
Maisonette Basement And Ground Floor 101 Hereford Road London W2 5BB
Amalgamation of existing lower ground and ground floor maisonette with the first floor flat to create a single dwelling and associated internal works including creation of a staircase. (Linked with 26/06270/LBC)