Planning application
25/05088/FULL
130 - 134 New Bond Street London
Proposal
Replacement of two metal windows to the rear elevation at first floor level. (Linked to 25/05089/LBC)
As published by the council, reference 25/05088/FULL
Timeline
Dates from the published record
-
22 Jul 2025
Received by Westminster
-
1 Oct 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05089/LBC Granted
130 - 134 New Bond Street London
Replacement of two metal windows to the rear elevation. (Linked to 25/05088/FULL)
-
06/00484/ADLBC Granted
130 New Bond Street London W1S 2TA
Details of the new opening in the party wall between No. 130 and 131-134 at first floor level pursuant to Condition 1 of listed building consent dated 10 January 2006 (RN: 05/09018).
-
06/00509/ADFULL Granted
130 New Bond Street London W1S 2TA
Details of the Portland Stone cladding to the pilasters pursuant to Condition 1 of planning permission dated 10 January 2006 (RN 05/09017).
-
05/09017/FULL Granted
130 New Bond Street London W1S 2TA
Replacement of existing pilasters with Portland stone pilasters, and replacement of existing fascia panels with aluminium panels. (Site includes 83-84 Grosvenor Street).
-
05/09019/ADV Granted
130 New Bond Street London W1S 2TA
Display of a halo-illuminated fascia signs
-
05/09018/LBC Granted
130 New Bond Street London W1S 2TA
Replacement of existing pilasters with Portland stone pilasters, replacement of existing fascia panels, installation of a halo-illuminated fascia sign and internal alterations at 1st floor level. (Site includes 83-84 Grosvenor Street).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.