Planning application
25/04975/ADFULL
12 Upper Belgrave Street London SW1X 8BA
Proposal
Details of door sets under entrance bridge pursuant to condition 7 (v) of planning permission dated 31 August 2023 (RN: 23/01615/FULL).
As published by the council, reference 25/04975/ADFULL
Timeline
Dates from the published record
-
17 Jul 2025
Received by Westminster
-
28 Jul 2025
Validated
Checked as complete and ready for consideration.
-
1 Aug 2025
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/02241/LBC Awaiting decision
13 Upper Belgrave Street London SW1X 8BA
Installation of internal fan coil units.
-
25/04872/ADLBC Granted
12 Upper Belgrave Street London SW1X 8BA
Details of door sets under entrance bridge pursuant to condition 5 (v) of listed building consent dated 31 August 2023 (RN: 23/01616/LBC).
-
25/03694/ADFULL Granted
12 Upper Belgrave Street London SW1X 8BA
Details of plant housing, acoustic enclosure and lift overrun (specifying materials and finished appearance for each element) pursuant to Condition 7 (vii) of planning permission dated 31 August 2023 (RN: 23/01615/FULL).
-
25/03635/ADLBC Awaiting decision
12 Upper Belgrave Street London SW1X 8BA
Details of plant housing, acoustic enclosure and lift overrun (specifying materials and finished appearance for each element) pursuant to condition 5 (vii) of listed building consent dated 31 August 2023 (RN: 23/0161/LBC).
-
25/03653/ADLBC Awaiting decision
12 Upper Belgrave Street London SW1X 8BA
Details of main roof lantern pursuant to Condition 5 (iii) of planning permission dated 31 August 2023 (RN23/01616/LBC)
-
25/03634/ADLBC Awaiting decision
12 Upper Belgrave Street London SW1X 8BA
Details of painted metal glazed screen to lobby (at 1:10, sections at 1:5).pursuant to condition 4(vi) of listed building dated 15 February 2024 (RN:23/03033/LBC).
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.